My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-182
CBCC
>
Official Documents
>
1990's
>
1999
>
1999-182
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2023 2:15:39 PM
Creation date
8/21/2023 2:15:33 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
07/13/1999
Control Number
1999-182
Entity Name
Carter & Associates
Subject
Work Order #3 for Professional Civil Services Master Agreement, August 4, 1998
Vero Lake Estates Stormwater Improvements, Phase I
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 F. No additional services are included for follow through after we submit final plans and <br />specs to the County. <br />G. Reimbursables - soil testing, mail, printing, telephone <br />SECTION IV - TIME FOR COMPLETION <br />A. The FDEP Grant application exhibits and review are to be completed and submitted to the <br />® FDEP office by July 6, 1999. All survey and design work will occur between October I, 1999 <br />and July 1. 2000 in accordance with the Grant requirements. CAI will deliver the plans, <br />specifications and summary of quantities to the County for bidding purposes on or before <br />April 1, 2000 so that bids may be received and actual construction started on July 1, 2000. <br />S SECTION V - COMPENSATION <br />The COUNTY agrees to pay, and the ENGINEER agrees to accept fee for services rendered according <br />to the Scope of Services, Task I, identified in Section III of this work order with a maximum charge under this <br />work order of $57,130. This fee is itemized as follows: <br />A. Project Scope Development, Grant Application Exhibits <br />and Technical Review $ 4,000 <br />B. Base Sheet and Boundary and Topographic Survey $27,000 <br />C. Schedule and Coordinate Soil Borings and <br />Evaluate Borings $ 3,040 <br />D. Engineering - Final Design, Plans, Specifications, <br />Summary of Quantities including Fill <br />Calculations $19,240 <br />E. Review Meetings with County and SJRWMD- 6 Required $ 2,850 <br />F. Reimbursables $ 500 (Estimated) <br />Soil borings - At cost 1,500 (Estimated) <br />Total $58,130 <br />SECTION VI - ADDITIONAL WORK <br />In the event changes are requested by the COUNTY or extra work is imposed to the COUNTY by the <br />demands of certain regulatory agencies after the approval by the COUNTY of this AGREEMENT, and upon the <br />---C of a Subscqueui work order by the Director of Public works Department, said extra work may <br />commence in accordance with the following fee schedule: <br />ENGINEER 1 ............................................................ $ 1 15W0/hr <br />ENGINEER H ........................................................... $ 85.00/hr <br />ENGINEER III ......................................................... $ 60.00/hr <br />ENGINEER TECHNICIAN .......................................... $ 50.0o/111- <br />SURVEYOR <br />0.00/ItrSURVEYOR I (Principal) ............................................ $ 115.00/lir <br />SURVEYOR N (Registered) .......................................... $ 65.00/hr <br />SURVEYOR III ......................................................... $ 55.00/hr <br />SURVEY CREW (3 -MAN) ........................................... $ 90.00/111 <br />CAD TECHNICIAN .................................................. $ 50.00/hr <br />DRAFTING.............................................................. $ 45.00/lir <br />SECRETARY/WORD PROCESSOR .............................. $ 30.00/1r <br />RESIDENT PROJECT REP ........................................... $ 35.00/hr <br />GRAPHICS ASSISTANT ............................................. $ 25.00/hr <br />RECORDING AND PERMIT FEES ................................ Cost + lo% <br />MATERIALS............................................................ Cost + 10% <br />TRAVEL................................................................. $ 0.29/Mile or Cost <br />J:\CYN\ENGPROJ\tRCStarmwtrMgmtlmprove\lRC-WORK ORDER NO 3-VerotkEs1.dec Page 3 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.