Laserfiche WebLink
s6 <br />40 <br />e <br />CARTER ASSOCIATES, INC. <br />CONSULTING ENGINEERS AND LAND SURVEYORS <br />1708 2151 STREET <br />MARVIN E. CARTER, P.S.M. <br />I VRRO REACH, FLORIDA 32960.3472 <br />DANA HOWARD. P.S.M. <br />.561.562.4101 <br />DEAN F. IX_FTIIJI:' I :. <br />561-562-7 180(11AX) <br />'wwxarICrB ssor.co01 <br />JOHN 11. ISLI'M, RE. <br />FRANK S. Cl'C.CURESE, RS.M. <br />MEMO <br />I):\\'ID E. LI I1'IIJE. P.% M. <br />C'sF.ORGE SIMONS, P.1:. <br />STEVE SNORERGER. P.E. <br />DATE: June 21, 1999 <br />PATRICK S. WALTHER, P.E. <br />TO: John Ladner, P.E., CDM <br />FROM: Marvin Carter, P.S.M. <br />RE: Topography Survey of Segment II and Infill of the Class I <br />Landfill, and <br />The C & D Landfill <br />We propose to perform this survey utilizing Real Time Kinematic -- G.P.S. Survey procedures. <br />The breakdown of our task/estimate cost is as follows: <br />1) Surveyor II: <br />(a) Mission Planning/Set-up G.P.S. Program: <br />(b) Onsite Recon/Inspection of Control: <br />Sub -total <br />21 Field Crew Time: <br />(a) Establish/Locate Horizontal -Vertical Control: <br />(b) G.P.S./RTK location (2 units — 1 Base) <br />- <br />C&DHill: <br />Segment II & Infill <br />Sub -total <br />3) G.P.S. Equipment Cost: <br />6 days x 3 units @$200.00 each/day <br />4) Office (Surveyor 11) <br />8 hours <br />4 hour <br />12 hours @$65.00/Itr.= $780.00 <br />3 hours <br />18 hours <br />36 hours <br />57 hours (a)$90.00/hr = $5,130.00 <br />_ $3,600.00 <br />Process G.P.S. Data 8 hours <br />Import to C.A.D.D.,Create/Edit TIN 8 hours <br />- C.A.D.D. Drawing/Volume Calcs. 24 hours <br />Sub -total 40 hours @$65.00/hr.= $2,600.00 <br />5) Survey 1 <br />Research, Administrative, Project Management <br />8 hours @,$95.00/hr.= $ 760.00 <br />TOTAL ESTIMATE COST = $12,870.00 <br />MERVERI.SEC RLTAR YWECUadnermemo.doc <br />�Altil•I� in�(I IGlsh <br />\tIL �i sm. VAI <br />