My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-187
CBCC
>
Official Documents
>
1990's
>
1999
>
1999-187
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2023 2:37:33 PM
Creation date
8/21/2023 2:35:31 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Miscellaneous
Approved Date
07/20/1999
Control Number
1999-187
Subject
Beach Preservation Plan Economic Analysis Phase II
Funding Sources and Financial Plan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
•i <br />40 <br />s <br />0 <br />1 <br />TABLE OF CONTENTS <br />Section <br />Page <br />1.0 <br />INTRODUCTION....................................................................................................... 1 <br />1.1 <br />PURPOSE................................................................................................................ <br />3 <br />1.2 <br />BENEFIT CATEGORIES........................................................................................... <br />4 <br />2.0 <br />STORM PROTECTION BENEFITS...........................................................................5 <br />2.1 <br />DATA COMPILATION AND BENEFITS METHODOLOGY ...................................... <br />5 <br />2.2 <br />CALCULATION OF STORM PROTECTION BENEFITS...........................................6 <br />2.3 <br />TOTAL STORM PROTECTION BENEFITS............................................................ <br />12. <br />3.0 <br />RECREATIONAL BENEFITS..................................................................................21 <br />3.1 <br />RECREATIONAL BENEFITS METHODOLOGY.....................................................21 <br />3.2 <br />DATA COMPILATION AND ANALYSIS OF RECREATIONAL BENEFITS .............. <br />24 <br />3.3 <br />EVALUATION OF BEACH USER SUREY RESPONDENTS ................................... <br />25 <br />3.4 <br />TOTAL RECREATIONAL BENEFITS...................................................................... <br />28 <br />4.0 <br />PROJECT COSTS..................................................................................................31 <br />4.1 <br />PROJECT DESCRIPTION......................................................................................31 <br />4.2 <br />PROJECT COSTS.................................................................................................. <br />33 <br />5.0 <br />RECOMMENDED FUNDING SOURCES................................................................41 <br />5.1 <br />INTRODUCTION..................................................................................................... <br />41 <br />5.2 <br />TOURIST DEVELOPMENTTAXES ........................................................................43 <br />5.3 <br />STATE OF FLORIDA BEACH EROSION CONTROL PROGRAM (BECP) FUNDS <br />44 <br />5.4 <br />THE LOCAL GOVERNMENT INFRASTRUCTURE SURTAX.................................48 <br />5.5 <br />SPECIAL ASSESSMENTS..................................................................................... <br />51 <br />5.6 <br />IMPLEMENTATION PROCESS FOR SPECIAL ASSESSMENTS .......................... <br />56 <br />APPENDICES <br />APPENDIX A --- INDIAN RIVER COUNTY SUMMER 1998 BEACH SURVEY <br />APPENDIX B — INDIAN RIVER COUNTY WIN TER 1999 BEACH SURVEY <br />G W119991w l 1.9898010 l I m <br />
The URL can be used to link to this page
Your browser does not support the video tag.