My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-153
CBCC
>
Official Documents
>
2020's
>
2023
>
2023-153
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2023 1:30:17 PM
Creation date
8/24/2023 1:26:11 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
08/15/2023
Control Number
2023-153
Agenda Item Number
8.L.
Entity Name
Division of Emergency Management
Subject
Modification to Sub Agreement for the elevation of the Historic Jones, Contract #H0566 funded
through the Hazard Mitigation Grant Program (HMGP) DR-4283-91
Project Number
4283-91-R
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A TRUE COPY <br />CERTIFICATION ON LAST PAGE <br />RYAN L. BUTLER, CLERK <br />The Sub -Recipient shall ensure that no contractors or subcontractors are debarred or suspended from <br />participating in federally funded projects. <br />The selected contractor shall have a current and valid occupational license/business tax receipt issued <br />for the type of services being performed. <br />The Sub -Recipient shall provide documentation demonstrating the results of the procurement process. <br />This shall include a rationale for the method of procurement and selection of contract type, contractor <br />selection and/or rejection and bid tabulation and listing, and the basis of contract price. <br />The Sub -Recipient shall provide an executed "Debarment, Suspension, Ineligibility, Voluntary <br />Exclusion Form" for each contractor and/or subcontractor performing services under this agreement. <br />Executed contracts with contractors and/or subcontractors shall be provided to the Division by the Sub - <br />Recipient. <br />The Sub -Recipient shall provide copies of professional licenses for contractors selected to perform <br />services. The Sub -Recipient shall provide a copy of a current and valid occupational license or <br />business tax receipt issued for the type of services to be performed by the selected contractor. <br />2) The Sub -Recipient shall monitor and manage the installation to provide flood protection. <br />The project shall be implemented in accordance with conceptual designs and construction plans <br />previously presented to the Division by the Sub -Recipient and subsequently approved by the Division <br />and FEMA. The Sub -Recipient shall ensure that all applicable state, local and federal laws and <br />regulations are followed and documented, as appropriate. <br />The project consists of the general construction and furnishing of all materials, equipment, labor and <br />fees to minimize recurring flooding and reduce repetitive flood loss to structures and roadways. <br />The Sub -Recipient shall fully perform the approved project, as described in the submitted documents, <br />in accordance with the approved scope of work, budget line item, allocation of funds and applicable <br />terms and conditions indicated herein. The Sub -Recipient shall not deviate from the approved project <br />terms and conditions. <br />Construction activities shall be completed by a qualified and licensed Florida contractor. All <br />construction activities shall be monitored by the professional of record. The Sub -Recipient shall <br />complete the project in accordance with all required permits. All work shall be completed in accordance <br />with applicable codes and standards. <br />Upon completion of the work, the Sub -Recipient shall schedule and participate in a final inspection of <br />the completed project by the local municipal or county official, or other approving official, as applicable. <br />The official shall inspect and certify that all installation was in accordance with the manufacturer's <br />specifications. Any deficiencies found during this final inspection shall be corrected by the Sub - <br />Recipient prior to Sub -Recipient's submittal of the final inspection request to the Division. <br />Upon completion of Task 2, the Sub -Recipient shall submit the following documents with sufficient <br />supporting documentation, and provide a summary of all contract scope of work and scope of work <br />changes, if any. Additional documentation for closeout shall include: <br />a) Local Building Official Building Permit. <br />b) A Copy of the Certificate of Occupancy or copy of the Local Building Official Inspection Report and <br />Final Approval, as applicable. <br />1. Certifying that the structure is code -compliant. <br />c) A Copy of the Elevation Certificate before mitigation, if available. <br />d) A Copy of the Final Elevation Certificate (FEMA Form 81-31), after mitigation — ensuring the <br />structure has been elevated to the proper elevation. <br />e) All Product Specification / Data Sheets (technical standards) satisfying protective requirements on <br />all products utilized. <br />
The URL can be used to link to this page
Your browser does not support the video tag.