My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-140B
CBCC
>
Official Documents
>
2020's
>
2023
>
2023-140B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/28/2023 10:24:25 AM
Creation date
8/28/2023 10:08:59 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
07/11/2023
Control Number
2023-140B
Agenda Item Number
8.X.
Entity Name
Florida Department of Environmental Protection (FDEP)
Subject
Revised Grant Agreement 231R2 for 2022 Hurricane Ian and Nicole Recovery Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
One (1) electronic copy of all written reports developed under this Agreement shall be forwarded to the <br />Department, unless otherwise specified. <br />Acronyms: <br />DEP — Florida Department of Environmental Protection <br />F.A.C. — Florida Administrative Code <br />F.S. — Florida Statutes <br />TASKS and DELIVERABLES: <br />The Local Sponsor will provide detailed scopes of work or a letter requesting advance payment if authorized <br />by Attachment 2, for all tasks identified below, which shall include a narrative description of work to be <br />completed, a corresponding cost estimate and a proposed schedule of completion for the proposed work <br />and associated deliverables. Each scope of work shall be approved in writing by the DEP Project Manager <br />to be included into this work plan for reimbursement. <br />Task 1.1: Construction — Sector 3 Beach <br />Task Description: This task includes work performed and costs incurred associated with the placement of <br />fill material and/or the construction of erosion control structures within the Project area. Project costs <br />associated with eligible beach and inlet construction activities include work approved through construction <br />bids and/or construction -phase engineering and monitoring services contracts. Eligible costs may include <br />mobilization, demobilization, construction observation or inspection services, physical and environmental <br />surveys, beach fill, tilling and scarp removal, erosion control structures, mitigation reefs, dune stabilization <br />measures and native beach -dune vegetation. Construction shall be conducted in accordance with any and <br />all State or Federal permits. The Local Sponsor will submit work products to the appropriate State or Federal <br />regulatory agencies as requested by the DEP Project Manager in order to be eligible for reimbursement <br />under this task. <br />Deliverable: Certification of Completion by a Florida -registered Professional Engineer with <br />documentation of submittal to the Department affirming the construction task was completed in accordance <br />with construction contract documents. For interim payment requests, a Task Summary Report signed by <br />Local Sponsor must be submitted detailing activities completed during the payment request period. The <br />Task Summary Report must include the dates and descriptions of all activities, surveys and reports <br />completed or in progress during the time period of the interim payment request. <br />Performance Standard: The DEP Project Manager will review the task deliverable and any associated <br />work products as necessary to verify they meet the specifications in the Grant Work Plan and this task <br />description. <br />Payment Request Schedule: Payment requests may be submitted after the deliverable is received and <br />accepted and may be submitted no more frequently than quarterly. <br />Task 1.2: Construction — Sector 4 Dunes <br />Task Description: This task includes work performed and costs incurred associated with the placement of <br />fill material and/or the construction of erosion control structures within the Project area. Project costs <br />associated with eligible beach and inlet construction activities include work approved through construction <br />bids and/or construction -phase engineering and monitoring services contracts. Eligible costs may include <br />mobilization, demobilization, construction observation or inspection services, physical and environmental <br />surveys, beach fill, tilling and scarp removal, erosion control structures, mitigation reefs, dune stabilization <br />DEP Agreement No. 231R2, Attachment 3, Page 2 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.