My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-192
CBCC
>
Official Documents
>
1990's
>
1999
>
1999-192
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/28/2023 12:03:39 PM
Creation date
8/28/2023 12:03:19 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
07/20/1999
Control Number
1999-192
Entity Name
Bill Bryant & Associated Inc.
Subject
Owner & Contract Agreement for Renovation of Fire/EMS Station 11
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
40 <br />ARTICLE 5 <br />PROGRESS PAYMENTS <br />5.1 Based upon Applications for Payment submitted to the Architect by the Contractor and Certificates for Payment Issued by the <br />Architect, the Owner shall make progress payments on account of the Contract Sum to the Contractor as provided below and <br />elsewhere in the Contract Documents. <br />5.2 The period covered by each Application for Payment shall be one calendar month ending on the last day of the month, Or as <br />follows: <br />One calendar month shall be the payment period. <br />5.3 Provided an Application for Payment Is received by the Architect not later than the twenty fifth <br />( 25th day of a month, the Owner shall make payment to the Contractor not later than <br />lite tenth (10th) clay of the fol l owing month. If an Appllcatlon for Payment is received by the <br />Architc •t after the application date fixed above, payment shall be made by the Owner not later than fifteen <br />(M days after the Architect receives the Application for Payment. <br />5.4 Each Application for Payment shall be based upon the Schedule of Values submitted by the Contractor in accordance with <br />the Contract Documents. The Schedule of Values shall allocate the entire Contract Sum among the various portions of the Work <br />and be prepared In such form and supported by such data to substantiate its accuracy as the Architect may rcqulre.'I'hls Schedule, <br />unless objected to by the Architect, shall be used as a basis for reviewing the Contractor's Applications for Payment. <br />l 5.5 Applications for Payment shall indicate the percentage of completion of each portion of the Work as of the end of the period <br />lcovered by the Application for Payment. <br />5.6 Subject to the provisions of the Contract Documents, the amount of each progress payment shall be computed as follows: <br />5.6.1 Take that portion of the Contract Sum properly allocable to completed Work as determined by 'Multiplying the percentage <br />completion of each portion of the Work by the share of the total Contract Sum allocated to that portion Of the Work In the <br />Schedule of Values, less retainage of ten perce <br />( 10 %). Pending final determination of cost to the Owner of changes In the Work, amounts not In dispute may bme <br />Included as provided In Subparagraph 7.3.7 of the General Conditions even though the Contract Sum has not yet been adjusted by <br />Change Order; <br />5.6.2 Add that portion of the Contract Sum properly allocable to materials and equipment delivered and suitably stored at the <br />site for subsequent Incorporation in the completed construction (or, if approved In advance by lite Owner, suitably stored off lite <br />site ata location agreed upon In writing), less retainage of ten <br />percent ( 10 %); <br />5.6.3 Subtract the aggregate of previous payments made by the Owner; and <br />5.6.4 Subtract amounts, if any, for which the Architect has withheld or nullified a Certificate for Payment as provided In Para- <br />graph 9.5 of the General Conditions. <br />5.7 The progress payment amount determined In accordance with Paragraph 5.6 shall be further nrodifird t ... i— hp_. <br />circumstances: - <br />5.7.1 Add, upon Substantial Completion of the Work, a sum sufficient to Increase the tout payments to <br />one hundred percent( 100 %) of the contrlct <br />Sum, less such amounts as the Architect shall determine for Incomplete Work and unsettled claims; and <br />5.7.2 Add, If final completion of the Work is thereafter materially delayed through no full of the Contractor, any addiliunal <br />amounts payable In accordance with Subparagraph 9.10.3 of the General Conditions. <br />5.8 Reduction ur IlnMltation of retainage, if any, shall be as follows: <br />(lilt Is lnlemled, prior W Substantial Cimrplel(un (f ibu entire I0,14, m reduce car Until Me retat—gu resN(btg (rum Ibe /rrrseua( <br />grs laser led In .1Lbp,um <br />graphs 5. (.l Bud 5.6.1 above, mol Ibis is ual expblbavl elseu•bere lit the Contract p(aaraeals, fart ben• f,rorisiuns/nr sorb re,lr(rlhur or linrllalinn j <br />Retainage shall remain 10% through substantial completion. <br />AIA DOCUMENT A70t - OWNER -CONTRACTOR AGREEMENT - TWP.1.FrII EDITION - AIA* - C)1787 -- <br />TItE AMERICAN INSI'ITIVIT OFAIICIII'1'ECTS, 1735 NEW Y[)IIK AVENUE. N.W. WASIIINGTON• D.C.:IaH16 A101-1987 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.