Laserfiche WebLink
($110,000), four (4) new vehicles for staff ($272,000), and an upgraded training site at the EOC ($550,000) <br />are included in the budget. Additionally, $267,564 is budgeted in Other Machinery & Equipment for items <br />• such as chest compression devices, power stretchers, replacement generator, and a replacement Elgard <br />System. <br />Eight (8) new positions are budgeted, which are mandated based on the International Association of Fire <br />Fighter's (IAFF) Local Union 2201 approved Collective Bargaining Agreement. These positions are projected <br />to start May 1, 2024, and result in an additional 3.33 FTEs. In addition, three (3) Emergency Operations <br />Battalion Chiefs to oversee operations, personnel, and stations, three (3) Fire -Medics, three (3) Rescue <br />Sergeants, and one (1) Training Captain are included. The total cost of all 13.33 FTE positions is <br />$1,440,655, including benefits. The County is currently engaged in negotiations with the IAFF for an <br />acceptable general wage increase. Although an agreement has yet to be reached, staff has included <br />additional funding to support an increase in wages. It is critically important for the County to stay <br />competitive in the local job market for first responders. <br />Seven (7) out of the fifteen (15) new full-time positions in the General & M.S.T.U. funds are related to the <br />executive and senior management reorganization at a combined cost of $815,408 for salaries, benefits, <br />and all required additional equipment and supplies. Various other positions such as a Fairgrounds/ <br />Campgrounds Facility Supervisor in Parks, Electrician in Facilities, Senior Environmental Specialist in <br />Lagoon, Head Lifeguard at Gifford Aquatic Center, Staff Assistant III in Recreation, Senior Planner and <br />Planning Tech II in Planning, and a Code Enforcement Officer have been added to increase our <br />responsiveness and level of services. In the Transportation Fund, a Right -of -Way Engineering Inspector, <br />Staff Assistant III, and Signal Cable Locator Foreman have been added, while a Road Projects Coordinator <br />has been removed with a total net cost of $140,428. These positions will help with the influx of <br />• transportation and fiber location projects. A Housing Specialist II has been added to SHIP to help address <br />the backlog in housing assistance applications. A Coastal Resource Manager is being added to the Coastal <br />Engineering Division to more effectively manage the workload and increased complexity of the division's <br />projects and evolving regulatory environment. These two positions come at a cost of $151,894 combined. <br />In the Enterprise Funds, Sandridge Golf Course requested a Staff Assistant III to assist with the increased <br />workload related to record number of rounds being played and the impending new clubhouse. Utilities is <br />adding a Community Affairs Manager and Safety & Training Coordinator, while eliminating the unfilled <br />Assistant Utilities Director position. Critical to planning for the future needs of the community is a Utility <br />Services Integrated Master Plan. The plan will aid the County in managing its current assets and guide <br />planning for future infrastructural and service needs. Fleet requested a Foreman in lieu of the current <br />Equipment Mechanic II position to establish more effective control and realign job duties. Based on the <br />growing technological needs of the County, Information Systems & Technology needs a Senior Server <br />Administrator to maintain existing systems and implement new capabilities. These positions total <br />$182,656. <br />The County continues its focus and commitment to addressing deferred maintenance and capital item <br />replacement in the proposed budget. Funding for these items were drastically reduced due to the Great <br />Recession to offset the impacts of reduction in revenues. The proposed budget includes the final year of <br />the original five-year deferred maintenance and capital replacement plan, $6,706,000 is budgeted for <br />these projects. $18,923,473 has been spent through September 30, 2022, on deferred maintenance and <br />capital projects, and an additional $8,280,754 is projected to be spent through September 30, 2023. <br />• Including the FY 2023/2024 budget, the total amount spent on these deferred projects will be $33,910,227 <br />over the five-year period. <br />6 <br />