My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-166B
CBCC
>
Official Documents
>
2020's
>
2023
>
2023-166B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/8/2023 2:04:32 PM
Creation date
9/8/2023 2:03:37 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
08/15/2023
Control Number
2023-166B
Agenda Item Number
8. AO.
Entity Name
Bowman Consulting Group, Ltd
Subject
Work Order No.2 for West Wabasso Septic to Sewer Phase 3A Construction Phase Services
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Work Order 02 — West Wabasso Septic to Sewer Phase 3A <br />EXHIBIT A -SCOPE OF WORK <br />Bowman proposes to provide the following services: <br />Task 1— Construction Administration & Certification Services <br />Upon issuance of the Notice to Proceed Bowman will provide engineering services to include the following: <br />1) Schedule and conduct a pre -construction conference with the Contractor and IRCDUS staff and provide <br />meeting minutes. Conduct a pre -work walk though to document existing conditions. <br />2) Review shop drawings and material submittals. <br />3) Review Contractor's pay requests. <br />4) Review request for information (RFI's) to help facilitate construction related activities: <br />a. Analyze and address field problems that arise <br />b. Evaluate change orders and time extension requests <br />5) Conduct periodic site visits to observe construction activities. <br />a. Prepare and maintain written reports of the contractor's progress and of significant events <br />affecting the work <br />b. Record noteworthy incidents or events with video and/or photography. <br />c. Observe and document construction testing activities — including materials testing, utility <br />testing, and other related activities. <br />d. Observe lift station start-up and certify proper operation. <br />6) Conduct Initial walk-through and prepare a punchlist upon substantial completion. <br />7) Review as -built survey provided by Contractor. <br />8) Conduct Final Inspection to ensure punchlist items are addressed. <br />9) Certify construction completion to Florida Department of Environmental Protection (FDEP) and Indian <br />River County Public Works. <br />10) Prepare a close-out package including inspection reports, testing data, final as-builts, and certifications. <br />These services are based on the 314 -day construction contract schedule. Increases in contract time may result in <br />additional work. <br />SERVICES NOT INCLUDED <br />Specifically excluded is resident or full-time inspection. <br />
The URL can be used to link to this page
Your browser does not support the video tag.