Laserfiche WebLink
ORDER NO. PSC -2023 -0180 -PAA -EQ <br />DOCKET NO. 20230046 -EQ <br />PAGE 7 <br />(Continuedfrom SheetNolft <br />1. tQ&iit <br />Attachment A <br />Page 2 of 42 <br />The QS contemplates, installing operatirgaWmabdaining a <br />KVA generating facility located <br />at (hereinafter called the "Facility'. The Facility is designed to <br />duce a maximum of kilowa€ s CVW�ofeleetric power at an 85% lagging to 85%o: leading, power factor. The <br />Faesility's location and generation capabilities are as describedinthe tablAelow. <br />TECHNOLOW AMQMqMA. <br />Leeatim,Spedficlegal descript�r(egHmetesmw tD14AWbo <br />ryith #Feet address , <br />,.Generator Type (Induction or Synclw fiousy <br />TM of Facility (Hydrogen produced from sources otherthan't'ossi ruels,biomass <br />as defined in Section 25-17.210 (2) F.A.C. ,solar energy, geothermal energy, wind <br />-energy, ocean energy, hydroelectric power, waste heat from sulfuric acid <br />manufacturiug operations: or <1 001M cogenerator) <br />Technology' <br />,IWIType and Source <br />00Rating (KVA) <br />Maximium:Capability(Kw) <br />'Peaking Capability <br />Net output(Kw) <br />:Power Factgt <br />Operating Voltage (k <br />"Peak Internal LoadK'Glt' <br />ne rouQwung secuons tat tnrougn ted are appneame to tcenewome energy raciuttes ('xhrs') w4 scessaW <br />applicable to Qualifying Facilities witha design capacity of 100 KW or less: <br />(et) Xthe QS is a RBF, dw-0 de-0represents and warrants that ` -lie sole sources 'af:fuel or power used by the Facilily <br />to. produce energy for sale to FPL during the term of this Contract shall be such sources as are defined in arA <br />.�'( <br />hided for pursuant to Sections _ififi.91(2}(e} and (b), Florida Statutes, and FPSC Rules 25=17.210(1} and.�2�; <br />Fossil fuels shall be limited to the minimum quantities necessary for start-up, shut -clown aZtd £dt" <br />" arability at minnnum load, and (ui) the REF is capable 4f generating the amqunt-cifeapacity,pur�illtt�i <br />�! tit Agreement withoutthe use. <br />(%) The Partiba agree and aclQiowledge that:if the Q3 is 0 REF, :thy: QS will iaiat; ft 1,F ill Il <br />obligation to pay: for, any electrical energy produced by the Facility frottt $ tf$* cif ft.W . <br />specifically provided forinparagrap}t I(a).above. <br />(Coad rued Maga %AM) <br />