My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07/11/2023
CBCC
>
Meetings
>
2020's
>
2023
>
07/11/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2023 12:11:11 PM
Creation date
9/14/2023 10:10:27 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
07/11/2023
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
574
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ORDER NO. PSC -2023 -0180 -PAA -EQ <br />DOCKET NO. 20230046 -EQ <br />PAGE 32 <br />Pontinued from Sheet No. W" <br />Attachment A <br />Page 27 of 42 <br />DELIVERY VOLTAGEADJUSTMENT <br />Energy payments to a QS within the Compat" service area shall0j. listed according to pit, by the <br />multipliers provided in the COG -1.. <br />PERFORMANCE CRITERIA <br />Payments for Firm Capacity are conditioned on the QS's ability to maintain the following performance criteria: <br />A. Capacity Delivery <br />The Capacity Delivery Date shatl.be no later than the projected in-service date of"the,Company's Avoided Unit, as detailed <br />in AppendixII. <br />B. Availability and Canacity Factor <br />The Facility's availability and capacity factor are used in the determination of firm capacity payments through a <br />performance based calculation as detailed in Appendix Bto the Company's Standard Offer Contract <br />METERINGREOUIREMENTS <br />A QS within the areas served by the C Wptitiy AVO b6, to purchase 006 tit¢ 'hourly recording meters to <br />measure their energy deliveries to the Company. "Erierbiy purchases from a QS outside tie territory of the Company shall be <br />measured. as the quantities scheduled for interchange to the Company by the entity delivering Firm Capacity and Reviewable <br />Energy to the Company. <br />Por":the purpose of this:Sehedule, the on -peak hours shall be those hours occurring April 1 through October 31 Mondays through <br />Fridays, from 12 noon.EST to 9:00 pm. EST excluding Memorial Day, independence Day and Labor Day; and November i <br />through March 31 :Mondays through Fridays from 6:00 am. EST to 10:00 a.m. EST and 6:00 p.m. EST to 10:00 p.m. EST <br />prevailing Eastern time excluding Thanksgiving Day, Christmas Day, and New Years Day. FPL shall have the right to charge <br />such On -Peak Hours by providing the QS a minimum of thirty calendar days' advance writtennotice. <br />BLUNG OPTIOiVS <br />A QS, upon entering into a Standard O rtc" untract ]rt tq ibm capacity and energy otpft . to delivery of a, available <br />energy, may elect to make either simultaneous purchases from and sales to the Company, or net sales to the Company; provided, <br />however, that no such arrangement shall cause the QS to sell more than the Facility's net output. A decision on billing methods <br />may only be changed:: 1) when a QS selling asavailable energy enters into a Standard Offer Contract for the sale of firm capacity <br />and energy; 2) when a Standard Offer Contract expires or is lawfully terminated by either the QS or the Company; 3) when the <br />QS is selling as -available energy and has not changed billing methods within the last twelve" 'when the election to <br />ehObp •balling methods will not contravene this Tariff orthe contract between the QS and the Compaiiy <br />If a QS, elects to change billing methods, such changes shall be subject to the following: 1) upon at least thirty days advance <br />written notice to the Company; 2) the installation by the Company of any additional metering equipment reasonably required to <br />effect the change in billing and upon payment by the QS for such metering equipment and its installation; and 3) upon completion <br />and approval by the Company of any alteration( s) to the, interconnection reasonably required to effect the change in billing and <br />upon payment by the QS for such alteration(s). <br />Payments duea QSwill be made monthly and normally,by the twentieth: business day Following the end of the billing period. The <br />kilowatt-hours sold: by "thb"QS and the applicable avoided energy rates at whi*,,pqmerrts are beitlg shall aaotimpany <br />pntyment to the,QS., <br />Xstatctuent coveri *4*4W, mrd payments dWthe Qt f ander ;tits tidtly; and liay ?toittf 3t # j'"the"tVVt+ <br />°d8yi+t�it�3�te etid�af►hebilling period, <br />Continued on Sheet 96A0.306) <br />l�:lllyt Tftmy,000 lift`1liftetor, Regulatory Rates, Cost of Service and Systems <br />Vie: Jl►nl,� <br />i3•�' <br />
The URL can be used to link to this page
Your browser does not support the video tag.