My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6/25/1996
CBCC
>
Meetings
>
1990's
>
1996
>
6/25/1996
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:05:50 PM
Creation date
6/16/2015 3:59:46 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
06/25/1996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bm 98 PA L 429 <br />ANALYSIS <br />The total cost associated with Phase I of this project is <br />$135,050.00. The project cost is $7,965.00 below the contract <br />amount. The amount of retainage to be released by approval of'this <br />change order and pay request is $12,475.60 Please refer to the <br />attached letter of May 16th from the engineer and the associated <br />Change Order No. 1, and Pay Request No. 2 from the contractor. <br />The staff of the Department of Utility Services recommends that the <br />Board of County Commissioners approve the proposed change order and <br />the release of retainage as outlined in the attached pay request. <br />AMISSIMCR <br />Vim(URTIONAL. <br />May 16, 1996 <br />Mr. Bill McCain MAY 22 1996 <br />Capital Projects Engineer <br />Indian River County <br />1840 25th Street ------------------- <br />Vero Beach, 1=L 32960 <br />Re: Hobart Park Well Construction - Phase I Completion Change Order <br />Contractor Pay Requests <br />Dear Bill: <br />The first phase of well construction at Hobart Park is complete. This work included <br />construction and testing of 1 of 3 production wells, construction of one monitor well, and <br />modification of one existing test well into a dual -zone monitor well. Phase 2 beginning <br />this month will include construction and testing of the remaining 2 production wells. <br />Enclosed are an original and 4 copies of Pay Requests No. 6 and No. 7 from American <br />Drilling, Inc. I have reviewed both pay requests and find that they accurately reflect the <br />work completed on Phase I and comply with the contract requirements. Pay request No. <br />6 is for the final tasks of the Phase I construction. Pay request No. 7 is for the retainage <br />withheld on pay requests 1 through 6 and one additional item for the water chemical <br />analysis requested of the contractor but not provided for in the original contract. The <br />contractor is billing for this item on a cost plus 15% as provided for in the contract. Back- <br />up documentation is provided. <br />In order to reconcile all of the items in the Phase I portion of the contract, I have provided <br />5 copies of a reconciliation table showing an overage or underage quantity and dollar <br />amount for each task including the additional chemical analysis cost. This reconciliation <br />table shows that, of the Phase I tasks, $10,294.00 remains unbilled. With the addition <br />of the extra chemical analysis at $2,329.00, a total contract amount of $7,965.00 will <br />remain unbilled on this Phase I portion. In order to close out this portion of the drilling <br />contract, I have provided 5 copies of a contract change order which reduces the contract <br />price by the Phase I unbilled amount of $7,965.00. <br />r <br />June 25, 1996 <br />� � r <br />
The URL can be used to link to this page
Your browser does not support the video tag.