My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-177
CBCC
>
Official Documents
>
2020's
>
2023
>
2023-177
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/5/2023 11:54:33 AM
Creation date
10/5/2023 11:53:44 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
08/29/2023
Control Number
2023-177
Agenda Item Number
8.Q.
Entity Name
MBV Engineering, Inc
Subject
Work Order 1 for 11th Drive and 37th Street Intersection Improvements
Project Number
IRC-2001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
procedures of construction or to related safety precautions and programs. Shop drawings, <br />samples or certifications are anticipated to be submitted related to the following: <br />• Roadway and Drainage elements <br />• Signing and Marking elements <br />6. Applications for Payment. Monthly applications for payment will be reviewed and <br />approved by the COUNTY. <br />Project Coordination. The ENGINEER or ENGINEER'S Inspector shall attend miscellaneous <br />filed meetings and provide coordination services with the various utilities and team <br />representatives as required to assist with construction related issues or concerns. <br />8. Record Drawing Review and Permit Certification. The ENGINEER will review the Record <br />Drawings as submitted by the Contractor. Based upon receiving acceptable Record <br />Drawings from the Contractor, the ENGINEER will prepare and submit certifications to the <br />following jurisdictional agencies: <br />• Indian River County <br />• St. Johns River Water Management District <br />9. Final Notice of Acceptability of the Work. The ENGINEER will promptly, after notice from <br />Contractor that it considers the entire Work ready for its intended use, in company with the <br />COUNTY and Contractor, conduct a site visit to determine if the Work is substantially <br />complete. Work will be considered substantially complete following satisfactory completion <br />of all items with the exception of those identified on a final punch list. The ENGINEER will <br />conduct a final site visit to determine if the completed Work of Contractor is generally in <br />accordance with the Contract Documents and the final punch list so that the ENGINEER may <br />recommend, in writing, final payment to Contractor. Accompanying the recommendation <br />for final payment, the ENGINEER shall also provide a notice that the Work is generally in <br />accordance with the Contract Documents to the best of the ENGINEER's knowledge, <br />information, and belief based on the extent of its services and based upon information <br />provided to Consultant upon which it is entitled to rely. <br />
The URL can be used to link to this page
Your browser does not support the video tag.