Laserfiche WebLink
• SITE LIGHTING CERTIFICATION, if required at end of project, is not <br />included in the scope or fees quoted herein, and will be an additional fee <br />of.• $750.00 <br />To Include: <br />(a) Perform one (1) on-site, Site Lighting Photometric analysis. <br />(b) Provide three (3) copies signed and sealed of report of findings. <br />Initial here to authorize <br />• CONSTRUCTION ADMINISTRATION, if required, is not included in the <br />scope or fees quoted herein, and will be an additional fee of. <br />$1,850.00 <br />To Include: <br />(a) Perform up to two (2) site visits as needed. <br />(b) RFI responses. <br />(c) Submittal review. <br />Initial here to authorize <br />Any additional services, other than those outlined herein, will be billed at rates listed <br />below: <br />$75.00 / Hr. - Clerical <br />$85.00 / Hr. - CADD <br />$95.00 / Hr. - Designer <br />$110.00 / Hr. — Engineering / Field Technician <br />$125.00 / Hr. — Project Manager <br />$225.00 / Hr. - Principals <br />Please allow 3-4 weeks (excluding weekends and holidays) for Construction <br />Documents after proper design criteria has been established and CADD files have been <br />received. <br />If you have any questions or need additional information, please let me know. <br />Sincerely, <br />KAMM CONSULTING, INC. <br />Duane Millar LEED AP <br />Project Manager <br />** NO WORK SHALL BEGIN WITHOUT <br />CUSTOMER WRITTEN AUTHORIZATION ** <br />1111 Dr and 37th St Roadway Lighting (07-18-23) <br />Page 2 <br />