Laserfiche WebLink
Alt <br />APTIM <br />August 9, 2023 <br />Eric Charest <br />Coastal Division <br />Indian River County Public Works <br />1801 27th Street <br />Vero Beach, FL 32960 <br />Aptim Environmental & Infrastructure, LLC <br />6401 Congress Avenue, Suite 140 <br />Boca Raton, FL 33487 <br />Tel: +1 561 391 8102 <br />Fax: +1 561 391 9116 <br />www.aptim.com <br />Subject: Indian River County, FL <br />Sector 5 — 2018029 — Work Order #12 <br />Year 3 Post -Construction Engineering Monitoring Report <br />Dear Eric: <br />This proposal outlines a scope of work for Aptim Environmental & Infrastructure, LLC (APTIM) to provide <br />a Year 3 post -construction monitoring report for the Sector 5 Beach and Dune Restoration Project (R-70 <br />to R-86) in Indian River County, which was completed in February 2020. This proposal was prepared to <br />fulfill the stipulations of the Joint Coastal Permit (JCP) No. 0363427 -001 -JC for the Sector 5 Beach and <br />Dune Restoration Project. The scope and fee were developed following the provisions of the Professional <br />Services Agreement between Indian River County and APTIM, dated April 3, 2018, to provide <br />engineering and biological support services in support of the Sector 5 Beach and Dune Restoration <br />Project (RFQ#2018029). <br />Scope of Work <br />Volumetric and contour changes at the Sector 5 Beach will be calculated using surveys that were <br />collected at the FDEP R -monuments by the County's surveyor, Morgan & Eklund. APTIM will review the <br />data to ensure that it conforms to the standards required by the FDEP physical monitoring plan. APTIM <br />will notify the County of any issues with the survey data and will coordinate through the County or directly <br />with the surveyors to resolve any issues. <br />APTIM will develop an engineering report that discusses the performance of the beach fill project. Beach <br />contour changes will be evaluated to document changes at the shoreline and the dune. Volumetric <br />changes will be quantified above MHW (+0.6 ft NAVD) and above the depth of closure. All computations <br />and distinguished erosion and accretion patterns/trends will be summarized with tables and graphical <br />representations in addition to plots of the survey profiles. <br />Deliverable <br />A Year 3 post -construction monitoring assessment will be provided in report format for the Sector 5 <br />project area. The report will summarize and discuss background information regarding the project, survey <br />datasets utilized, beach contour and volumetric changes, and overall project performance. The report <br />appendices will include the raw survey data and superimposed plots of the two most recent beach <br />profiles, the design template, and pre- and post -construction profiles. <br />