Official Document Type
Agreement
Approved Date
08/29/2023
Control Number
2023-180
Agenda Item Number
8.T.
Entity Name
Jim’s Complete Construction, LLC
Subject
Agreement Section 00520 Agreement for Information Technology Office & Finance Office Remodel
Project Number
IRC-2004 & IRC-2205
Bid Number
2023049
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4.02 Days to Achieve Substantial Completion, Final Completion and Final Payment <br />A. The Work will be substantially completed on or before the 90th calendar day after the date <br />when the Contract Times commence to run as provided in paragraph 2.03 of the General <br />Conditions, and completed and ready for final payment in accordance with paragraph <br />14.07 of the General Conditions on or before the 120th calendar day after the date when <br />the Contract Times commence to run. <br />4.03 Liquidated Damages <br />A. CONTRACTOR and OWNER recognize that time is of the essence of this Agreement and that <br />OWNER will suffer financial loss if the Work is not completed within the times specified in <br />paragraph 4.02 above, plus any extensions thereof allowed in accordance with Article 12 of <br />the General Conditions. Liquidated damages will commence for this portion of work. The <br />parties also recognize the delays, expense, and difficulties involved in proving in a legal <br />proceeding the actual loss suffered by OWNER if the Work is not completed on time. <br />Accordingly, instead of requiring any such proof, OWNER and CONTRACTOR agree that as <br />liquidated damages for delay (but not as a penalty), CONTRACTOR shall pay OWNER <br />980.001 for each calendar day that expires after the time specified in paragraph 4.02 for <br />Substantial Completion until the Work is substantially complete. After Substantial <br />Completion, if CONTRACTOR shall neglect, refuse, or fail to complete the remaining Work <br />within the Contract Time or any proper extension thereof granted by OWNER, <br />CONTRACTOR shall pay OWNER $980.001 for each calendar day that expires after the <br />time specified in paragraph 4.02 for completion and readiness for final payment until the <br />Work is completed and ready for final payment. <br />ARTICLE 5 - CONTRACT PRICE <br />5.01 OWNER shall pay CONTRACTOR for completion of the Work in accordance with the <br />Contract Documents, an amount in current funds equal to the sum of the amounts <br />determined pursuant to paragraph 5.01.A and summarized in paragraph 5.01.13, below: <br />A. For all Work, at the prices stated in CONTRACTOR's Bid, attached hereto as an exhibit. <br />B. THE CONTRACT SUM subject to additions and deductions provided in the Contract: <br />Numerical Amount: $ 241.050.00 <br />Written Amount: Two hundred forty-one thousand, fifty dollars <br />ARTICLE 6 - PAYMENT PROCEDURES <br />6.01 Submittal and Processing of Payments <br />A. CONTRACTOR shall submit Applications for Payment in accordance with Article <br />14 of the General Conditions. Applications for Payment will be processed by <br />ENGINEER as provided in the General Conditions and the Contract Documents. <br />'Reference for liquidated damages amount "Standard Specifications for Road & Bridge Construction, Florida Department of <br />Transportation (FDOT) FY 2023-24, Section 8-10.2 for projects over $50,000 but less than $250,000. THE ACTUAL LIQUDATED <br />DAMAGES AMOUNT WILL BE BASED ON THE CONTRACT AMOUNT AWARD AMOUNT AND WILL BE DETERMINED USING <br />THE REFERENCED FDOT CRITERIA. <br />Agreement _ 00520 - 3 <br />F:\Public WaAo\ENGINEERING DIVISION PROJECTS\20D4 IRC rr Olfioe\1-Admin\Bids\Bid Documents\For Advedisement\DN 0_1—Bid and Contract Doc_IRC-2004&2205.d= <br />