Laserfiche WebLink
APTIM August 9, 2023 <br />Page 2 of 3 <br />3. The most recent MHW shoreline positions (feet) in comparison to the design profile at each <br />individual monument location <br />4. The MHW shoreline position changes (feet) relative to the pre -construction survey at each <br />individual monument location for all the monitoring periods <br />5. The total measured remaining volume (cubic yards) in comparison with the total predicted <br />remaining volume (cubic yards) above the MHW line and above the Depth of Closure for the entire <br />project area over the successive monitoring periods <br />6. Any other shoreline position and/or volumetric analysis the Engineer deem useful in assessing, <br />with quantitative measurements, the performance of the project. <br />Deliverable <br />A Year 1 post -construction monitoring assessment will be provided in report format for the Sector 3 <br />project area. The report will summarize and discuss background information regarding the project, <br />survey datasets utilized, beach contour and volumetric changes, and overall project performance. The <br />report appendices will include the raw survey data and superimposed plots of the two most recent <br />beach profiles, the design template, and pre- and post -construction profiles. <br />Schedule <br />APTIM will provide the deliverable within 90 calendar days of receipt of the Sector 3 Beach and Dune <br />Restoration Project survey data. It is assumed that the survey data provided by the County has been <br />processed and is considered final. <br />Cost <br />The total lump sum cost to perform the proposed work described herein for — Work Order #16 is <br />$27,818.00. Please refer to Exhibit 2, attached to the end of this proposal, for a summary of the costs <br />and labor hours of each Task. APTIM will proceed with the tasks upon receipt of a signed work order <br />from Indian River County (unless stated otherwise in the schedule). It is noted that some aspects of this <br />Work Order are dependent upon Contractor performance and are outside the control of APTIM and the <br />County. As such, the scope, schedule and cost described herein is provided as an estimate. APTIM will <br />strive to execute each phase of the work within budget and in as expeditious a manner according to <br />construction progress. We will coordinate with the County in the event that the scope, schedule, or budget <br />arise due to unforeseen issues or circumstances. <br />Thank you for the opportunity to serve Indian River County. We look forward to continuing to provide <br />expert professional services to the County. Please do not hesitate to call if you have any questions.,,,,,, <br />•���MISS/ <br />Sincerely, '�J�' Frs`''• <br />*, <br />.r_ <br />Nicole S. Sharp, P.E. Client orized Signature <br />Coastal Market Lead <br />Aptim Environmental & Infrastructure, LLC Joseph H.1 Earman <br />Printed Name <br />Chairman <br />Title <br />