My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09/12/2023
CBCC
>
Meetings
>
2020's
>
2023
>
09/12/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/12/2023 10:20:06 AM
Creation date
10/12/2023 10:02:49 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
09/12/2023
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
410
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
U, <br />INDIAN RIVER COUNTY, FLORIDA <br />MEMORANDUM <br />TO: Board of County Commissioners <br />THROUGH: John A. Titkanich, Jr. County Administrator <br />FROM: Richard B. Szpyrka, P.E., Public Works Director <br />SUBJECT: Providence Pointe PD <br />Waiver Request to Eliminate 15 -foot Stormwater Maintenance Area <br />DATE: September 5, 2023 <br />CRIPTION AND CONDITIONS <br />The Engineer of Record for the Providence Pointe PD development has contacted Public Works and <br />Planning regarding a wavier to eliminate the requirement for the 15 -foot Stormwater Maintenance <br />Area (SMA) around the stormwater retention system in Phase Two of the development. See the <br />attached Waiver Request Letter. <br />Phase two of the development features a unique design with the residential units located close to the <br />rear property line at the lake. The lake is proposed to be entirely built with a seawall, with the homes <br />built close to the rear, which incorporates porches/decks that overhang the seawall over the lake and <br />will have access docks for small water craft (canoes, kayaks, small sailboats). See the attached <br />Boathouse Exhibit. <br />Planning and Zoning approved the conceptual plan for Phase Two on June 22, 2023. The Engineer was <br />aware at that time that the Board would need to approve a waiver to the SMA and due to the unique <br />design Public Works and Planning would support a waiver request to the Board. <br />The Developer is planning on moving forward with the design of Phases One and Two, but is reluctant <br />to complete the design and submit a Land Development Permit (LDP) application until a waiver to the <br />15 -foot SMA for phase two is approved. <br />No funding is required for this item. <br />RECOMMENDATION <br />Staff recommends that the Board approve the waiver to eliminate the 15 -foot Stormwater <br />Maintenance Area for Phase Two only and condition the approval such that if the design concept <br />changes in the future, the waiver will be terminated. <br />276 <br />
The URL can be used to link to this page
Your browser does not support the video tag.