Laserfiche WebLink
COST ESTIMATE <br />46TH PLACE E IMPROVEMENTS <br />INDIGO <br />Item <br />Description <br />Quantity Unit <br />Unit Price <br />Total Price <br />1000 <br />Demo and Earthwork <br />01 <br />Mobilization <br />1.00 LS <br />10000.00 <br />10,000.00 <br />02 <br />Maintenance Of Traffic <br />1.00 LS <br />15000.00 <br />15,000.00 <br />03 <br />Maintenance Of Traffic <br />1.00 LS <br />12500.00 <br />12,500.00 <br />04 <br />Silt Fence - Furnish And Install <br />700.00 LF <br />3.50 <br />2,450.00 <br />05 <br />Construction Entrance <br />1.00 EA <br />4500.00 <br />4,500.00 <br />06 <br />Other SWPP Requirements <br />1.00 EA <br />10000.00 <br />10,000.00 <br />07 <br />Remove Asphalt <br />1,330.00 SQYD <br />4.50 <br />5,985.00 <br />08 <br />Excavate Retention Pond <br />2.00 EA <br />11500.00 <br />23,000.00 <br />09 <br />Grade ROW And Behind Curb <br />1.00 LS <br />8000.00 <br />8,000.00 <br />10 <br />Grade Swale <br />300.00 LF <br />11.00 <br />3,300.00 <br />11 <br />Remove Existing 2" WM <br />1.00 LS <br />3000.00 <br />3,000.00 <br />12 <br />Remove Existing FM <br />1.00 LS <br />5000.00 <br />5,000.00 <br />13 <br />Remove Base Rock <br />1,330.00 SQYD <br />8.00 <br />10,640.00 <br />14 <br />Sod <br />3,540.00 SQFT <br />2.30 <br />8,142.00 <br />15 <br />Irrigation Repair <br />1.00 LS <br />2000.00 <br />2,000.00 <br />Total: <br />123,517.00 <br />2000 <br />Roadway <br />01 <br />1" FC-9.5 (TL-C Asphalt) <br />1,400.00 SQYD <br />35.00 <br />49,000.00 <br />02 <br />2" Asphalt Pavement <br />1,450.00 SQYD <br />38.00 <br />55,100.00 <br />03 <br />10" Coquina Base <br />1,600.00 SQYD <br />26.00 <br />41,600.00 <br />04 <br />ERP-1 Prime <br />1,600.00 SQYD <br />1.00 <br />1,600.00 <br />05 <br />12" Stabilized Subgrade <br />2,000.00 SQYD <br />7.50 <br />15,000.00 <br />06 <br />Type F Curb <br />320.00 LF <br />36.50 <br />11,680.00 <br />07 <br />Type D Curb <br />270.00 LF <br />28.00 <br />7,560.00 <br />08 <br />6" Concrete Sidewalk In R/O/W <br />2,182.00 SQFT <br />10.50 <br />22,911.00 <br />09 <br />6" Concrete Paving <br />300.00 SQFT <br />11.25 <br />3,375.00 <br />10 <br />Handicap Ramps (with A.D.A. <br />7.00 EA <br />1050.00 <br />7,350.00 <br />11 <br />Concrete Flumes <br />3.00 EA <br />2125.00 <br />6,375.00 <br />12 <br />Striping & Signage (Thermo) <br />1.00 LS <br />11250.00 <br />11,250.00 <br />13 <br />Temp Asphalt Driveway <br />2.00 EA <br />6500.00 <br />13,000.00 <br />Total: <br />245,801.00 <br />3000 <br />Drainage Items <br />01 <br />Type C Inlet <br />2.00 EA <br />8,700.00 <br />17,400.00 <br />02 <br />Storm Sewer - 12 X 18" ERCP <br />161.00 LF <br />130.00 <br />20,930.00 <br />03 <br />Mitered End Section <br />3.00 EA <br />1,950.00 <br />5,850.00 <br />Total: <br />44,180.00 <br />Other <br />01 <br />Fence and Gate at Park <br />1.00 LS <br />35,000.00 <br />35,000.00 <br />02 <br />Survey - Stake-out/ As-Builts <br />1.00 LS <br />25,000.00 <br />25,000.00 <br />03 <br />Testing (Geotech) <br />1.00 LS <br />10000.00 <br />10,000.00 <br />