My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-208
CBCC
>
Official Documents
>
2020's
>
2023
>
2023-208
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/16/2023 4:07:51 PM
Creation date
10/16/2023 4:07:21 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
09/26/2023
Control Number
2023-208
Agenda Item Number
8.G.
Entity Name
Lawrence Lee Construction Services, Inc
Subject
Section 00520 Agreement for Central (Gifford) WWTF Generator and ATS Replacement,
Bid Number
2024003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 00520 Agreement <br />THIS AGREEMENT is by and between INDIAN RIVER COUNTY, a Political Subdivision of the <br />State of Florida organized and existing under the Laws of the State of Florida, (hereinafter called <br />OWNER) and Lawrence Lee Construction Services Inc. (hereinafter called CONTRACTOR). <br />OWNER and CONTRACTOR, in consideration of the mutual covenants hereinafter set forth, agree <br />as follows: <br />ARTICLE 1 -WORK <br />1.01 CONTRACTOR shall complete all Work as specified or indicated in the Contract <br />Documents. The Work is generally described as follows: <br />The proposed project consists of replacing the Main Electrical Building stand-by generator system <br />and demolishing the Solids Handling Building stand-by generator system. The scope of work will <br />include installation of temporary power systems, demolition of existing generator and fuel system <br />equipment, installation of proposed generator and fuel system equipment, and site and structural <br />improvements to accommodate the proposed demolition and construction work, as described <br />herein and shown on the construction drawings and specifications. <br />ARTICLE 2 - THE PROJECT <br />2.01 The Project for which the Work under the Contract Documents may be the whole or only a <br />part is generally described as follows: <br />Project Name: Central (Gifford) WWTF Generator and ATS Replacement <br />Bid Number: 2024003 <br />Project Address: 3550 491' Street, Vero Beach FL 32967 <br />ARTICLE 3 - ENGINEER <br />3.01 Kimley-Horn and Associates, Inc. is hereinafter called the ENGINEER and will act as <br />OWNER's representative, assume all duties and responsibilities, and have the rights and <br />authority assigned to ENGINEER in the Contract Documents in connection with the <br />completion of the Work in accordance with the Contract Documents. <br />ARTICLE 4 - CONTRACT TIMES <br />4.01 Time of the Essence <br />A. All time limits for Milestones, if any, Substantial Completion, and completion and readiness <br />for final payment as stated in the Contract Documents are of the essence of the Contract. <br />4.02 Days to Achieve Substantial Completion, Final Completion and Final Payment <br />A. The Work will be substantially completed on or before the 420th calendar day after the date <br />when the Contract Times commence to run as provided in paragraph 2.03 of the General <br />Conditions, and completed and ready for final payment in accordance with paragraph 14.07 <br />of the General Conditions on or before the 480th calendar day after the date when the <br />Contract Times commence to run. <br />Agreement (Public Works) REV 04-07 - 00520 - 2 <br />F:\Purchasing\Bids\2023-2024 FV (2024000)\2024003 central WWTF Generator and ATS Replacement\Agreement.doa <br />
The URL can be used to link to this page
Your browser does not support the video tag.