Laserfiche WebLink
supply facilities plan, etc. but will report the findings of the Owner's current plans and <br />analyses including LOS as part of the Element DIA. <br />C. Transportation (4) - Specific to the Transportation/Mobility Element, analysis will be <br />conducted for input into the Transportation Element Update by evaluating existing, 5 -year <br />horizon, and the long-term planning horizon for the Owner's Comprehensive Plan. The end <br />results of analyzing future transportation needs will be the development of a coordinated <br />Mobility Plan which addresses all modes of travel. However, based on Consultant's <br />preparation of the 2045 LRTP (and several prior LRTPs), we have data that will be used in this <br />Element and others, to help facilitate the use of not only the most recent data/analysis <br />available but also our enhanced understanding of the Owner. <br />1. Existing Conditions — Consultant will use available traffic counts to identify existing <br />LOS for roadways within the Owner. Consultant will incorporate transit, bicycle, and <br />pedestrian facilities, and identify existing LOS for each of these modes as documented <br />in the LRTP. Maps and tables of transportation infrastructure and operating <br />conditions will be developed, including the identification of existing needs for all <br />modes. <br />2. 2028 Conditions (i.e., five-year horizon) — Consultant will use historic trends to project <br />2028 traffic volumes and will identify the 2028 LOS for roadways within the Owner. <br />Maps and tables of transportation infrastructure and operating conditions will be <br />developed, including the identification of 2025 system needs for all modes. <br />3. 2045 Conditions (i.e., long-term horizon) — Consultant will use the available <br />transportation model, along with the consideration of historic trends, to project 2040 <br />traffic volumes and will identify the 2040 LOS for roadways with the Owner. Maps and <br />tables of transportation infrastructure and operating conditions will be developed, <br />including the identification of 2040 system needs for all modes. <br />4. If needed, Consultant will update the model to include key roads and accessibility to <br />Traffic Analysis Zones (TAZs) within the Owner to more accurately represent the <br />network within and adjacent to the Owner. These minor model edits do not include a <br />sub -area recalibration. <br />D. Economic Development (5) — not included; (non -required Element) <br />E. Capital Improvements (6) - (It is understood the Owner will provide the Owner's adopted 5 - <br />year CIP for use by Consultant in the preparation of this Element). Consistent with F.S. <br />Chapter 163.3177(3) (b), The capital improvements element must be reviewed by the local <br />government on an annual basis. Modifications to update the 5 -year capital improvement <br />schedule may be accomplished by ordinance and may not be deemed to be amendments to <br />the local Comprehensive Plan. <br />n <br />