My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-212
CBCC
>
Official Documents
>
2020's
>
2023
>
2023-212
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/16/2023 4:23:27 PM
Creation date
10/16/2023 4:22:40 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Amendment
Approved Date
09/26/2023
Control Number
2023-212
Agenda Item Number
8.N.
Entity Name
Kimley-Horn and Associates, Inc.
Subject
Amendment No. 3 to Work Order 25, Hobart Park Renovations for
Restroom connection and utility service plans revisions
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
b. Signed and sealed record surveys (As-Builts) for all infrastructure construction and <br />stormwater management construction, prepared by the contractor's registered land <br />surveyor to the level of the detail required by the various regulatory agencies. We will <br />review these drawings up to two (2) times. <br />c. Satisfaction of all final punch lists generated by Kimley-Horn, the Client and/or the <br />regulatory inspecting agencies. <br />d. Periodic observation of the constructed improvements during construction as described <br />above. <br />Consultant will prepare statements of completion to: <br />1. Indian River County Utilities <br />2. FDEP <br />3. IRFWMD <br />EXHIBIT B — FEE SCHEDULE <br />The COUNTY agrees to pay, and the Consultant agrees to accept for services rendered pursuant to this <br />Agreement fees inclusive of expenses in accordance with the following: <br />A. Professional Services Fee <br />The basic compensation mutually agreed upon by the Consultant and the COUNTY is as follows: <br />Lump Sum Components <br />Task Labor Fee <br />Construction Phase Services $ 6,925 <br />TOTAL $ 6,925 <br />EXHIBIT C — TIME SCHEDULE <br />Upon authorization to proceed by the COUNTY, final design documents are expected to take approximately <br />sixty (60) days from the Notice to Proceed (NTP). <br />NTP <br />contingent upon BOCC approval <br />Plans Preparation 30 days following NTP <br />
The URL can be used to link to this page
Your browser does not support the video tag.