My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-213
CBCC
>
Official Documents
>
2020's
>
2023
>
2023-213
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/16/2023 4:26:48 PM
Creation date
10/16/2023 4:25:31 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Amendment
Approved Date
09/26/2023
Control Number
2023-213
Agenda Item Number
8.O.
Entity Name
Masteller & Moler, Inc.
Subject
Amendment No. 3 to Work Order 25, Hobart Park Renovations for Restroom
connection and utility service plans revisions
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
M j MASTELLER & MOLER, INC. <br />M i — CIVIL ENGINEERS — <br />EXHIBIT A <br />165527 1h Street, Ste. 2, Vero Beach, FL 32960 <br />(772) 567-5300 <br />The Indian River County Parks and Recreation Department (Parks & Rec) plans to install a restroom <br />building adjacent to the existing playground area located just north of the softball diamonds at the Fran <br />B. Adams North County Regional Park (WW Ranch Rd & C.R. 512). Under Work Order 2, Masteller & <br />Moler, Inc. (MM) performed engineering design and preparation of construction plans, site planning and <br />project permitting, and is authorized to perform bidding services and construction administration & <br />observation services. Work Order 2 included provisions for a pre -fabricated restroom building to be <br />installed. Amendment 1 to Work Order 2 authorized revising plans and permitting reacquisition for a <br />concrete masonry unit (CMU) block building designed by one of the County's Architectural / MEP <br />consultants in lieu of the pre -fabricated building. <br />Under Amendment 1 to Work Order 2, the plans were revised for the new restroom building and the <br />project was fully permitted for construction. Upon submittal of the final bidding documents and <br />architectural plans, it was determined that the architectural drawings disagreed with the permitted civil <br />plans, and the civil plans and permit applications needed to be revised and resubmitted, respectively. <br />Amendment Number 2 to Work Order 2 proposes to provide additional permitting services such that <br />Parks & Rec can be in a position to formally bid and construct the project. The required permit <br />applications have been submitted, and will require additional response to agency comments in order to <br />satisfy permitting conditions. <br />Scope of Work: <br />Task M — Revised Electrical Engineering Services: We shall use the services of our electrical engineering <br />sub -consultant to provide electrical engineering services for the building redesign. The electrical <br />engineering services will generally include ensuring adequate power is delivered to the restroom <br />building site and furnishing of revised electrical plans and diagrams as necessary. <br />Task N — Permit Application Responses: Our office is in receipt of the Requests for Additional Information <br />(RAI's) from SJRWMD and Indian River County Technical Review Staff. We will work closely with the <br />Project Team to develop responses to agency concerns. As the scope of work to respond to these specific <br />agencies' concerns is defined by the comments received to date, and our office has already prepared <br />responses and made submittals, we propose to perform Task O for the lump sum amount as listed in the <br />fee schedule below. <br />Fee Schedule: <br />Task M — Revised Electrical Engineering Services <br />Task N — Permit Application Responses <br />Time Schedule: <br />1. Amendment No. 1 shall be completed as follows: <br />A. Revised Design & Submittal of Permit Applications <br />2. Deliverables — No Change from Amendment 1 to Work Order 2 <br />Page 1 of 1 <br />290.00 <br />2,520.00 <br />30 Working Days <br />
The URL can be used to link to this page
Your browser does not support the video tag.