My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08/15/2023 (3)
CBCC
>
Meetings
>
2020's
>
2023
>
08/15/2023 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/23/2023 10:56:55 AM
Creation date
10/23/2023 10:54:57 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Minutes
Meeting Date
08/15/2023
Meeting Body
Board of County Commissioners
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Board of County Commissioners Meeting Minutes - Final August 15, 2023 <br />12.G.1. 23-0581 CR -510 FDOT Widening Concept - Possible Closure of Existing Old Dixie <br />Railway Crossing <br />Recommended Action: Staff is requesting direction from the Board on the possibility of closing the FEC <br />railway crossing on Old Dixie Highway to accommodate the widening project for <br />CR -510 <br />Attachments: Staff Report <br />Old Dixie FEC Railway Crossing Map <br />Old Dixie FEC Railway Crossing Sebastian <br />CR 510 Alternative 3 <br />Public Works Director Richard Szpyrka appeared before the Board to discuss a <br />Project Development and Environmental (PD&E) study the Florida Department <br />of Transportation (FDOT) was conducting as part of the plan to widen CR -510 <br />to four lanes from 58th Avenue to east of US -1. At issue was the Florida East <br />Coast (FEC) railroad crossing at CR -510 and US -1 and FEC's policy that when <br />lanes are added to a crossing, those lanes must be compensated for by closing <br />another crossing in the general area. <br />The FDOT suggested closing a nearby crossing where the FEC railroad crossed <br />Old Dixie Highway in order to compensate for the CR -510 widening, as shown in <br />presented photographs. Mr. Szpyrka showed that Old Dixie Highway south of <br />the railway crossing was narrow and in disrepair. Staff sought direction from the <br />Board on the possibility of closing this railway crossing. <br />Commissioner Loar was informed by Mr. Szpyrka that the County could give up <br />their rights to FEC and the FEC would close the crossing; similar compensations <br />had been made previously. In response to Commissioner Flescher, Mr. Szpyrka <br />suggested the closure would benefit area development because the County <br />gained an expanded intersection at CR -510 and US -1 in exchange for closing the <br />south segment of Old Dixie Highway, which was unsuitable for heavy traffic. He <br />mentioned unresolved negotiations with the Spirit of Sebastian Development, <br />which wanted full access to that stretch of Old Dixie Highway, and the County <br />which maintained safety concerns. <br />Mr. Szpyrka also noted there were limited crossings available to satisfy the FEC's <br />rule, and closing this low volume road segment would impact the County the least. <br />Commissioner Moss was informed this stretch of Old Dixie Highway was not on <br />the County's CIE list for widening. County Administrator Titkanich discussed the <br />details of road closure procedures with Mr. Szpyrka. <br />Karen Mechling, representing the developers of the Spirit of Sebastian, stated the <br />developer would like to be part of the process in deciding the future of Old Dixie <br />Indian River County Florida Page 26 <br />
The URL can be used to link to this page
Your browser does not support the video tag.