Laserfiche WebLink
Avenue is not impacted by the development traffic, including construction <br />traffic. In any event, 7411 Avenue must be paved within six months after all <br />right-of-way (R/W) is acquired by the COUNTY or by December 31, 2001, <br />whichever is later. <br />Instead of the COUNTY constructing 7411 Avenue, the DEVELOPER may construct <br />® 74`1 Avenue between SR60 and 1211 Street after the COUNTY acquires needed right <br />of way, subject to the Public Works Director approving construction costs based <br />O upon competitive bids. Performance Bond, Payment Bond and proper insurance will <br />be required. <br />0 The estimated cost of the project is $400,000 plus R/W acquisition. The DEVELOPER shall <br />pay the costs of site related turn lanes, if any are needed. The COUNTY shall pay 100%ofthe cost <br />of the project between SR60 and 16" Street. The COUNTY and DEVELOPER shall each pay 50% <br />of the cost of the project between 161h Street and 12t1 Street, with the exception of site related left <br />turn lanes. The DEVELOPER shall dedicate 60' of right of way for 74' Avenue, without <br />compensation, along the project's 74t1 Avenue frontage. The COUNTY shall purchase any <br />additional right-of-way required for 74'1 Avenue from DEVELOPER at fair market value. ($12,000 - <br />$15,000 per acre) The preliminary Planned Development plans for Phase I of the DEVELOPER's <br />project shall include a golf cart path design for the 74i1 Avenue crossing acceptable to the Public <br />Works Director. <br />3. Prior to the issuance of the first Ceitificate of Occupancy or Certificate of <br />Completion for Phase IA (SR60 entrance, entrance road, one Town Center block, <br />and several residential blocks), the DEVELOPER shall design, obtain permits, and <br />construct 161 Street as a two-lane road, with left turn lanes as needed from 74t1 <br />Avenue to the west property line of Pointe West. As an alternative, DEVELOPER <br />may provide a paved access from SR60 through the project to any building <br />requesting a Certificate of Occupancy prior to Dec. 2001, and manage traffic so that <br />16i1 Street is not impacted. In any event, the paving of 16t1 Street must be complete <br />by Dec. 31, 2001. Stormwater management for the project shall be routed to the <br />Pointe West project where necessary as approved by the Public Works Director. The <br />COUNTY shall approve all design, permit applications, and contract documents prior <br />to construction. The design from the west property line of West Lake Estates <br />easterly along lots 10, 11, 12, 13, 14, 15, and 16 shall include a culvert within the <br />Indian River Farms Water Control District canal (IRFWCD) per the Districts design <br />rrrniirnni�nta. r__ this 1^.ewt:o, 1 vi1 ."i,rCot shall �C Gviiai[7icicii wiilull UIe existing SU° <br />road right-of-way and the existing 30' canal right-of-way. From the east property line <br />of lot 12, West Lake Estates, the road shall transition northerly to align with the <br />desired location of i611 Street Cast of 74" Avenue. The COUNTY shall not obtain <br />any additional right-of-way from lots 10 through 16, West Lake Estates, but right-of- <br />way shall be acquired from the Developer south of the 1611 Street sublateral canal. <br />A six (6) foot opaque feature (concrete wall) will be constructed along 16i1 Street <br />J <br />adjacent to lots 10 thro„gl? 16 Wept Lake Estates. Cost shall! be aEiNrvJeu by by <br />ttie <br />2 <br />