Laserfiche WebLink
Per Month Costs <br />South Tower Site <br />Control Point <br />North Site <br />Fellsmere Site <br />Dispatch Equipment <br />Stobart Site <br />Excluded Items <br />Batteries for DC Power Systems <br />Antennas and Coaxial Lines <br />Tower Labor <br />Lightening and Acts of Cod <br />Fiber System <br />Tower Lighting <br />$ 2,140.00 <br />$ 2,200.00 <br />$ 2,360.00 <br />$ 1,130.00 <br />$ 3,038.50 <br />$ 912.00 <br />Monthly Total S 11,780.50 <br />1999 CPI (1.020884) <br />1099 CPI Total $ 12,026.52 <br />Yearly Total $ 141,366.00 <br />1999 CPI Total S 144,318.24 <br />