My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-221
CBCC
>
Official Documents
>
1990's
>
1999
>
1999-221
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/31/2023 3:34:35 PM
Creation date
10/31/2023 3:19:01 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Miscellaneous
Approved Date
08/24/1999
Control Number
1999-221
Entity Name
Treasure Coast Contracting, Inc.
Subject
Sebastian Water Assessment Project, Phase 2C
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
189
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br />• <br />11 <br />6706-450 <br />deducted from the next payment due CONTRACTOR under the terms of this <br />Contract. <br />SC -14.13. <br />Delete paragraph 14.13. of the General Conditions In Its entirety and Insert the <br />following In its place; <br />14.13. If, on the basis of ENGINEER's observation of the Work -during construction <br />and final Inspection, and ENGINEER's review of the final Application for Payment <br />and accompanying documentation - all as required by the Contract Documents, <br />ENGINEER Is satisfied that the Work has been completed and CONTRACTOR's <br />other obligations under the Contract Documents have been fulfilled, ENGINEER will <br />Indicate In writing his recommendation of payment and present the Application to <br />OWNER for payment. Thereupon ENGINEER viil give written natice to OWNER and <br />CONTRACTOR that the Work is acceptable subject to the provisions of paragraph <br />14.15. Otherwise, ENGINEER will return the Application to CONTRACTOR, <br />Indicating In writing the reasons for refusing to recommend final payment, in which <br />case CONTRACTOR shall make the necessary corrections and resubmit the <br />Application. if the Application and accompanying documentation are appropriate as <br />to form and substance, OWNER shall, within sixty-five days after receipt thereof <br />pay CONTRACTOR the amount recommended by ENGINEER. <br />'105L aiBfi! <br />Add a new paragraph immediately after paragraph 14.13 of the General Conditions <br />which Is to read as follows: <br />14.13.1. Final payment will be reduced by the amount of excessive costs of plant <br />Inspection of pipe. Excessive costs are defined as the inspection costs incurred by <br />.^..:'.V 01 "iwi `at -at aiimount of pipe whiuh exceeds i:c5 percent or he aggregate <br />length of each type installed. <br />ARTICLE 15. SUSPENSION OF WORK AND TERMINATION <br />SC -15.2. <br />Add a new paragraph immediately after paragraph 15.2.4. of the General <br />Conditions which Is to read as follows. <br />15.2.5. if CONTRACTOR abandons the Work, or sublets this Contract or any part <br />thereof, without the previous written consent of -OWNER, or if the Contract or any <br />2121195 <br />04800-18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.