Laserfiche WebLink
7.5 CONTRACTOR nas correlated the results of ins still such <br />observations, examinations, <br />explorations, tests, reports and studies with the terms <br />and conditions of the Contract Documents. <br />7.6 CONTRACTOR has given ENGINEER written notice of all <br />conflicts, errors or discrepancies that he has <br />discovered in the ContractDocuments <br />anac-ceptale writtento <br />resolution thereof by <br />CONTRACTOR. <br />Article 8.CONTRACT DOCUMENTS. <br />The Cntrct e the <br />ent between <br />OWNERoandaCONTRACTORtconcerning thes which work <br />� k consisteofgmthefollowing, <br />8.1 This Agreement (Section 00530). <br />8.2 Performance and other bonds (Sections 00610 and 00620). <br />8.3 Notice of Award and Notice to Proceed. <br />8.4 General Conditions (Section 00700)- <br />8.5 supplementary Conditions (Section 00800). <br />8.6 Specifications bearing the title "SEBASTIAN <br />WATER ASSESSMENT PROJECT PHASE 2C" as listed <br />in the table of contents hereof. <br />8.7 Drawings, inclusive with each sheet bearing <br />the following general title: <br />'•SEBASTIAN WATER ASSESSMENT PROJECT PHASE 2C" <br />8.8 Addenda numbers _ to _, inclusive. <br />8.9 CONTRACTOR's Bid (Section 00310). <br />8.10 Indian Enver County Water and Wastewater <br />Utility Standards. <br />8.11 The following, which may be delivered or issued after <br />the effective date of the Agreement and are not attached <br />hereto: All written amendments and <br />ot the documents <br />amending, modifying, or supplementing <br />ontract <br />Documents pursuant. to Paragraphs 3.4 and 3.5 of the <br />General Conditions. <br />FA -5 <br />