My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-221
CBCC
>
Official Documents
>
1990's
>
1999
>
1999-221
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/31/2023 3:34:35 PM
Creation date
10/31/2023 3:19:01 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Miscellaneous
Approved Date
08/24/1999
Control Number
1999-221
Entity Name
Treasure Coast Contracting, Inc.
Subject
Sebastian Water Assessment Project, Phase 2C
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
189
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
do <br />-neoded by CoNTRAMR. ENGINEER and othets as SP- <br />prupd.te vn'll be held to establish a vrorking undaxtandinP <br />I WMt Otte parties as to the Work mod to disenss the sehcdutcs <br />zfetsed to in paralnph 2•6• procedures for handling Shop <br />Drawings and other subtrtitlals. processing APACatiom for <br />Payment and rstaintaining required records. <br />Irurimily Aix-epe's� S+��iatra: <br />"_.F.. Unless othcrtvise provided in the Contract Doc -r <br />amu„ at least ten days before: submission of the fust Appiica- <br />tion for payment a conreirnee atteoded by CONTRACTOR. <br />TOR. <br />ENO INEER and others as appropriate will be heli to review <br />"or aaxptability to ENGIN CER as provided below the sched- <br />ules submitted in uxardance with paragraph' b. CONTRAC- <br />TOR Shall have an additiortaf ten days to make conations and <br />Wjustmersu and to complete and resubmit the schedules. No <br />progress payrtscnt sltxdi be made to CONTRACTOR until the <br />schedules are submincd to Snd ?tic iii t beNGINEERePtWe to <br />provided below. The proyscs <br />ENGINEER as pmvidinv an orderly pmpression of the Wort: <br />to oompletiott within any specified Midcstartcs and the Cwitract <br />Times. but such acceptance will neither impose on ENGI- <br />NEER responsibility forthe sequencing. schedulingor prof rrss <br />of the Work nor'tntcsfcm wittt or rciieve. CONIRACMR from <br />CON RACPOWSfullresponsibilitytherefor.CONTRACTOR's <br />schedule of Slurp Drawing " Sample submissions will be <br />*oeptabla to ENGINEER as providing a workable wvaAV- <br />ment for rc-viewing and prtx.cssing the required submittals. <br />CONTRACTOR"s schedule of values will be acceptable to <br />ENGINEER as to form and substance. <br />ARTICLE:r—CON-iRACT DOCUMENTS; iMNT, <br />AMENDING. REUSE <br />catiow and inserprct3siom of the Contract Dontmcnts shall be <br />issued by ENGINEER as provided in paragraph 4.4. <br />3.3. Re(errnrr to Suurdnrd% and Specbicadow of Tccha+eat <br />Sociecier: Its wutrg and Resofriat I}"pone - <br />Iruattar <br />3.1. Tlic Contract Doacuments comprise the entire agrce- <br />mens between OWNER and CONTR CTC)R conanine the <br />Waric ills Canuact Dociuments aro complementary*. what is <br />called for by one is as binding Is if called for by all. The <br />Contract Documents will be construed in accordance with the <br />taw of the place of the Project. <br />g,? It is the intrat of the Co"traet Documents to describe <br />a functionally Complete Traject for pan themcfl to be con- <br />structed in acccrdawr c with the Contact Documents, Any <br />Work. materials or equipment taut may re2sonab Iy be in rerrcd <br />rmm the Conatact Documents or from prcvIlling eusram or <br />trade usage as being required to produce the intended result <br />will be furnished and performed whether or not spccificatiy <br />called for, When wands or phrases which have a wren. known <br />technical or construction industry or trade meaning arc used to <br />describe Work. materialsorequiprncnt. such words orphrascs <br />shall be inttrprctcd in accordance with that mcanin f. Cluih- <br />$-i.l. Reference to startdasds, spcciFirxrians. manuaistar <br />codes of any technical society, orpniratioa a association. <br />or to the Jaws or Regulations of any tovcrttmentat authority. <br />whether such rcfertnc-e be spcdfic or by ittipftcaiwn. sbull <br />mean the latest standard. specificatim mantud. code or <br />Daws or fte'utations in efTect at elle time of opening of Bids <br />tor. on the Effective Date of the Agreattent if there were no <br />Bidsr, except as may be otherwise spcdfically stated in the <br />Contract Documents. <br />3.3.�. It. during the performance of the Work, COiti- <br />'1 l,t; &OR discovers any canllict. error. ambiguity or dis- . <br />crop rlc%- within the Contract Documtnts or betwcen.the <br />Comms Documents and any provision of any such I-aw or <br />Regulation applicable to the performance of the Work or of <br />any such standard. specifmicn.-mankt2l or cede or of any <br />instruction or any Supplier referred to in paragraph 6.5. <br />CONTRACTOR shall report it to ENGINEER inwhritins At <br />once. and. CONTRACTOR shall not proceed <br />withe Work <br />affected rricrcby (except in an cmcq=cy u authorixcd by <br />paragraph 6'31 until an amendment or supplement to the <br />Contract Documents has been issued by one of the methods <br />indicated in paragraph 3.5 or 3,6. provided. however, that <br />CONTRACTOR shall not ])c liable to OWNER or ENGI- <br />NEERfar failu t to report any such conflict. error. ev unless CONTRACTOR kntw or rm <br />bigu- <br />iso or discrcpan , <br />mason - <br />261y should have known thereof. <br />3.3Except as attierwise speeificsily stated in Elie <br />Contract Documents or as may be provided by amendment <br />or suppiement Thereto issued by one of the methods indi- <br />cwcd in paragraph 3.5 or 3.6. the provisions of the Contract <br />Documents shall take precedence in rtsoiving any conflict. <br />error, ambeiguity or discrepancy between the pnavisians of <br />the Contract Documents and: <br />3.3.3.1. the orovisions of any such standard, spcei- <br />ircation. manual. code or instruction twh0let or not <br />specificalty incorporated by reference in she Contract <br />00cumcntsi: or <br />3.3.3?, the provisions of any such Carrs or Rcgv- <br />lations appiictbtc to the performance of the Work <br />[unless such an interpretation of the ptravisians of the <br />Contrail Documents would result in violation of such <br />Law or RepntationI. <br />No rma ision of any such standard. spceifir}tian, manual. <br />code orimtruction shall be effective tochange the dutiesand <br />responsi'biliticsorOWNER.CON RACTORorENCrrNEER. <br />or Inv of their subcontractors. consultants. agents. or em- <br />ploycrs from those set forth In the Contract Documents, nor <br />Shall it be efrcclive to assign to OWNER. ENGIo RKML <br />any of ENGINEER'%(:onsultants. amts orcmPl <br />Yces <br />duty of authority ro supervise or direct the furnishing or <br />nr)7f1i7_1 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.