My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-221
CBCC
>
Official Documents
>
1990's
>
1999
>
1999-221
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/31/2023 3:34:35 PM
Creation date
10/31/2023 3:19:01 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Miscellaneous
Approved Date
08/24/1999
Control Number
1999-221
Entity Name
Treasure Coast Contracting, Inc.
Subject
Sebastian Water Assessment Project, Phase 2C
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
189
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
nesponsihitiucs shall be the pm-,cntion of seadenu and the <br />maintainint and supervWAg of su'cty precalllions and pro• <br />mutts. <br />vii &-d Carerrtrutk4don fraKrrrmr <br />6 —)% CONTRACMR O all be taportsibk fiH COOtdinurnt <br />any ext wlc of rnatcrial safety data sheets or other ME" <br />commulitation irtformaLim required to be made evaitsble to or <br />cxchanmed between of aawrgf employers at the site in scree= <br />dance with lasws or Reyuljuims. <br />Epw rentia: <br />623. Mn aafix sine care saresy or pnotedtiEM of <br />p,Mns Of the Wrxk or property at the We of adaacxms <br />dwrelo. CONTRIiCiOft.. withouit special instrtsesixsnt Or awt- <br />tawnizxtion from owHE t or ENGINEER. is oElilrawd to <br />W to prevent rhreucned d_ ag_ boury or lass. CON- <br />TRACTOR SW give ENGINEER Pmerapt wrinjo aoticc if <br />CON-rPLACM11 bdkvcc"Any at'trscant dtan0's in the <br />Work or vuiwions from dee COrttratx Daessrrsenta have been <br />caused thereby. If ENGINEER dsseralines that a Change in <br />the Contract Documrnls is required because of the action <br />uk,n by CONTRACTOR in response to such an enverP s'icY. <br />a Work Chante Directive or Change Oster trill be issued to <br />doeelonent the consectwTIers of such — <br />ti -6-2A <br />Shap f7rrt-i W need S-99- <br />6.24. 1. <br />ys <br />6.24.1. CONTRACTIOR shall submit Shop OrawirrRs to <br />ENGIN ELR for review and approval in aocordaurce with tha <br />acacpted schedule of Shop Drawings and Sample sttber>>"Ah <br />Isec patra;raph 2-91. ASI subminals will be idendfle9d as <br />ENGINEER MAY regUire and is the number Of copiex <br />specified in the Gcne:W Requirestscnm The dsu shown on <br />the Shop DrawinF% wal be txmmolew with mIPW 10 gtranU- <br />ties. dimestsions. speciriod pedortraurrae and design cri tri <br />materials and sirnilar din to show ENGINEER the maacn- <br />a11 and equilxncru CONTRACTOR proposes to provide and <br />to enable ENGINEER to review the irdormation for the <br />limited purposes required by paragraph 6.-6. <br />6.24a CONTRACTOR shall also submit Samplts to <br />ENGINEER for review and aapraral in accordarxe with <br />said -cc: icd schedule of Shots Drawing and Sarnple stcb- <br />minsis. Each Sample will be identified ctculy as to Male" - <br />Supplier. pertinent data such as catalog numbers aril the us-- <br />for <br />sefor wlfich intended and otherwise as ENGINEER may <br />require to enable ENGINEER to rtview the submiiW for <br />the iirrtitcd purposes required by Wrninvh 6.26. The num- <br />bers of c=h Sample [a be suornitmd "I be as specified in <br />the Specifications. <br />6.15, Subr+u'anr Prvcrd ury <br />6.75.1. Bcfaru submitting csch 'Shop Omwinf or Sam- <br />ple. CON-rRAG TC]R shall have detcrmined and vefiricd: <br />6i5.i.l. all field MCULIrerntnls. quatltities. dimes• <br />siatts. specified petformiance crittria, ituall.Won require - <br />menu, mu,crW$. csulog numbers and similar infortnition <br />with respeer thereto. <br />623.1'. all rrutctills with respect 10 intended use. <br />fabrication. shippin, harrdting. sWrale, atscmblY and <br />jrtsulsrttiots pcanwning to the paforrtuusce of the Work. and <br />6.35.4 all inrorsttuion relative to CONTRAC R's <br />Gore responsibi'litia in respect of means, nxshods. tech. <br />rsiques, scqucnraet and precedo"3 of construction and <br />stray prVcWAiO0SVW»s incident diereto. <br />CONTRACMR sha11 also hart reviewed and coondinased <br />rads 'Shop Orawinl or Sarnp♦e roach other Shap Lks++rirlla <br />and Sampk3 VW with the rNuiretTomts of the Yt%rk and the <br />C,,or urw Goeilmw[ntt. <br />Mach subalit7[al will bc*r it stamp of apcd& <br />w,,en imdi W on Nus CONTRACTOR has sasi%W CON- <br />1'1rJiCTC:° `s e!r!ij3:sts+� s-.�. s."h'i<.w:�. !�c�s:..� •• w-; 4 <br />trspaet ro CONTRJIC'1;T7R°S ncviev+ and approval of than <br />submiseal• <br />6'33. At the time of r=* submission. CONT1> AMR <br />shall gi, ENGINELR specific "a— troche of such vui- <br />stSc^: rr =,y. th;e t! -Shap Dn ir,: or e«-`1cFbe .ul5tssixttd <br />may have from the requirements of the C -w --t Documents. <br />such notioce to be in a written commt-iatipn separate from <br />the submittal: and. in add'it'ion, shall cause a specific rtarsrion <br />10 be msd,e on each Shop Drav+irtl attd Samrlc subrnitrtd to <br />ENGIN EER foareview am approval of c=h such variation. <br />63.6,. ENGINEF-R vnll mvicw usd approve Shop Drawings <br />and Samples in accordance with the schedule of Shop Draw- <br />ings and Samplc submittals accepted by ENGINEER as re- <br />quired by pua.lraph 29. ENGINEER's review 91111 approval <br />will be only to determine if the items covered by thic submittals <br />will. after installation or incorporation in the Work.. confaim to <br />the information liven in the Contract Dvctstnents and be <br />compatible with the design concept of the oompletcd Pmjcct as <br />i 4r1I FwLLVI{I4 +.�4 is H;;.4 u.s W...= <br />ENGINEER's review and approval will not extend to means. <br />methods. techniaucs.. scqucrm= or procedures of construction <br />lexcept where a particular nw=. method. technique. ac- <br />qucnce or proccdure of corwruct on is sf ihr4ly and cx- <br />prrssly called for by the Contract Documenul or to sar«y <br />pretatttians or programs incident there10. The review and <br />approval Oft scoratc item as such will not indicateapprovaa of <br />the assembly in which the item functions. CONTRACTOR <br />shall make corrections required by ENGINEETIA and scull <br />tai ed number of co restcd copies of Shop return the req Draw - <br />view and <br />infs aSamples for Fiend submit as required few Pnuan in <br />approval. CONTRACTOR shall direct Specific artetofor by <br />%vrilinr to revisions other than the corrections c>J <br />lcd ENGINEER on previous submittals. <br />6.a7. ENGINEER -a review and approval of Shap Or4w- <br />in fs or Samples shall not relieve CONTRACTOR from- resp°"' <br />sibility for anv +narration from the requirements of the contxx <br />00700-7B <br />
The URL can be used to link to this page
Your browser does not support the video tag.