My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-221
CBCC
>
Official Documents
>
1990's
>
1999
>
1999-221
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/31/2023 3:34:35 PM
Creation date
10/31/2023 3:19:01 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Miscellaneous
Approved Date
08/24/1999
Control Number
1999-221
Entity Name
Treasure Coast Contracting, Inc.
Subject
Sebastian Water Assessment Project, Phase 2C
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
189
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br />the Contract Docunwru. as well at 0 continuntg oNiptions <br />indicated in the Contract Oocumo tS- will survive final pay. <br />mono- comPtcdon and aocep<ancc of the Work aro] termination <br />ex completion of the Asrcemmt. <br />AR-11CLE: 7 --MER WORT{ <br />4rlaerd Wog* at Stirt: <br />7.1. C7MNER may perform other work rdsud to the <br />project at the sit= by OWNER'S own .forces. or let other <br />direct contracts therefor which shall contain General Condi- <br />dons similar to lhesc or have other wont perfortsted by <br />utility owners. If the fact that welt other 'wort h to be <br />,performed was trot noted in the Contract Documents. them: <br />iii "(= ntxiec khetcaof ,vii; be given w Citi. iRAMivil <br />prior to Starting any Stich other wart. and fill CONTRAC- <br />TOR ,wary mike a r.lsim therefor u provided in Atucks 1I <br />and 17 if COR AC OR believes that Such perf*ftrtar A <br />will involve additional cxpcsLtc to COHTRAC1C3R Of re- <br />quires additional time and the ponies arc unable 10 apvc as <br />to the amount or extent taercof. <br />7.1 CONTf RACCOR shall afford each other eonuactor <br />who is a putt' to such a dived contract and each utility <br />owner sand OWNER- if OWNER is performing the addi- <br />tional work with OWNER's employeesd proper and We <br />access to the site and a reasonable opportunity for the <br />introduction and stors4c of materials and equipment and the <br />execution of such other work and dull properly connect and <br />coordinate the Work with theirs. Unless otherwise Provided <br />in the Contrux lirxurnents. CONTRACMR shall do all <br />cutting. ftttini and patching of the Work that may be required <br />to make its several Parts come together properly and mtc- <br />gratc with such other work. CONTRACTOR shall not en- <br />danger any work of others by cutting. excavating or -d other- <br />. uw <br />_.-- ..._.. - a <br />..M.� n.�v �. <br />with the written consent or ENGINEER -M the others <br />whose work will be affected. The duties and responsibilities <br />of CONI'R.ACIOR under this paragraph are for the bene tit of <br />such utility owners and other contractors to she extent that <br />there arc comparablc provisions for the benefit of CON- <br />TRACTOR to said direct contracts between OWNER and <br />such utility owners and other con:r=ors. <br />7.3. If the proper execution or results of any pan of <br />CONTRACTOR', Work depends upon walk performed by <br />others under this Article 7. CONTRACTOR Stull inspect. such <br />otlrerwork and promptly report to ENGINEER in writing any <br />delays. defects or de-ficiencies in such other work that render it <br />uetavaitablt or unnuitsblc for the proper execution and results <br />of CONTR.ACTOR's Work. CONTRAC OR.'s failure $o to <br />report will Constitute an acceptance of Such other .pork as fit <br />and proper for integration withCONTRACMR's Work except <br />for latent or noruppsrcm defects and deficiencies in Stools other <br />work. <br />C <br />7.4. If OWNER contracts wish others for the performance <br />,(other worse on the Pmj= at the sire- the fallowing will be set <br />forth in SuppkxrnenuutY Conditions: <br />7.4.1. the perutt. firm Of eorpefstlan wrltp told have <br />authb(ity avid responsibaky for coved iadots of the activities <br />amort, the various porno aawar>curs will be ikrxrtifted. <br />7..4.5 the specific nuiri s to be covm4 by such author- <br />ity am responsibility wr7l be iterruad: and <br />7.4-3. the Qaiunt Or Such authority and rrsports+-bdities <br />ww be pttnvided. <br />(Unless othcr�'isc provided in the Supplesnentary +Conr3i- <br />tio,, OWNER shall have tote authority and responsibility in <br />le of such coordination. <br />ARTICLE "WNER'S RESPONSIBILMES <br />l.1. Eaa[+t as otlserwxss provided in these Genua! C�ndi- <br />tions. OWNER shall issue all commtus� to CON''1 tAC- <br />Tftp thfmrsh ENt;INUR <br />E.2. In cue of termination of ux employment of ENGI- <br />NEER. OWNER "I aProint air cztgincss agatnxt wham <br />CONT"RICMR (Makes no rcasortahle Cinjectitm. whose status <br />under the Contract Documenu ths11 be that of the former <br />ENGINEER <br />t1.3. OWNER shall fumish the data required of OWNER <br />urdcr the Conwact Documents pmmpdv and shall ((cake pay- <br />ments to CONTRACTOR prompriv when they are due as <br />provided in paragra0s 14.4 aryl 14.13. <br />11.4. OWNER's duties in respect of providing lands and <br />casements and peoviding enrineering surveys to establish rcf- <br />ent:ncc pains are set forth in pu%4 aphs 4.1 and 4.4. ParMT+ph <br />4.2 refers to OWN ER's idenLdV rs and making available to <br />CONTRACTOR Copia of reports of explorations and tens of <br />subsunc,e conditions at the site and drawings of physical <br />conditions in existing strut:neresat of contiguous to the Cite that <br />at <br />have beutilised try ENGINEER in prepuing the <br />Documents. <br />83. OWNER's responsibilities in respc^ct of Purchasing <br />and mainlining liability and properly insuravtcc are set forth in <br />paragraphs 5-5 thtough 5.10. <br />9.6. OWNER is obligated to execute Chaaee Orders as <br />indicated in pxragmPh 10.4. <br />8.7. OWN ER's responsibility in respect of certain inspec- <br />tions. tests and approvals is set forth in paragrtplt 13.4• <br />S.B. In connection with OK'NFR's righ[ to stop Work or <br />suspend Work. see pwrAVAphs 13.10 sass 15.1. VwvVraph 15-7 <br />deals with OWNER's light to terminarc services of COM <br />TRACTOR under cousin circumstances' <br />Oa7O0-30 <br />
The URL can be used to link to this page
Your browser does not support the video tag.