My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-221
CBCC
>
Official Documents
>
1990's
>
1999
>
1999-221
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/31/2023 3:34:35 PM
Creation date
10/31/2023 3:19:01 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Miscellaneous
Approved Date
08/24/1999
Control Number
1999-221
Entity Name
Treasure Coast Contracting, Inc.
Subject
Sebastian Water Assessment Project, Phase 2C
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
189
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F] <br />r <br />that ENGIN EER Ix i-- -11 riot pmducc a nompkxcd Project <br />LW nonfarm to the contrace'Dcumenu or that WM preytsclice <br />the intmgsaty Oi the design OXWXtx of the con ed Project as <br />a functkx irts whole as indicated by the C ruratt 00DOMGnts. <br />ENGINEER will also have authority to teei'ure sial inspoc- <br />tion or testing of the Worst as proyidod in paragraph 13.9. <br />whatlux or not the Worst is fahtimled. iuWkd or completed. <br />shnp Lirvx.i:rrr. Chen ;e Orden and P4? - <br />9.7. to roruwction with ENGINEER tiawhoft as l h 6-M <br />90 <br />Shop Drawin pand 5arnpits. see pa <br />inclusive. <br />9.t. In connection with ENGINEER's authority as to <br />ChaW Ordcrat. see Articles 10. I I- and 11- <br />9.9. in ex npcedon with ENGINIEER'a atdhtirity as !ho <br />Appliataons for Payment- sat Article 11, <br />p,uypw� ns for unit Prkri: <br />9.10. ENGINEER will detcrminc the SMW quLAt:wk%antd <br />tSasstrcadortt of Unit F4ioc Worst perfortncd by CONTRAC- <br />TOF. EVOINFIF. w*ll .ry rw wfwh r5r7FfTFtAt-MR ty - FN- <br />GIN1 ER's prdiirnio-y dcterm rr d-1 ort Oxh moors bd— <br />radeaing a wrirrus decision the moo (by motion of an <br />Apptk=ion for Payrrscm or otherwise). ENG WEER's wrr ten <br />decision thereon will be final and binding upon OWNER and <br />CNTR,µl2'filR- unkm within ueaa days afar the dam of any <br />such dads;M. either OWNER or CONTRAMR delivers to <br />the other and to ENGINEER written sena of intention to <br />appal from ENGWEER's decision and: lil an appeal from <br />ENGINEER's dccision is taken whhio the time limits and in <br />,ccord.= with the prvccdums set forth in Exiubil GC -A. <br />'UsPutc Resolution Agreement." entered into between <br />OWNED[ uA CONTRACMR puruum to Article Ib. or OR if <br />no such f7is;wsc Rcsoluion Agrserncnt has been entered into. <br />a fomvl procced.trlg is instituted by the MnxW4 Parry in a <br />forum of can pacm juriuiiciiOn to exercise tach rithts or <br />ENGINEER s derision. unless Otherwise speed in wrid" by <br />OWNER and CONTRACMtL 5eseh appeal will. not be sub�iect <br />to the pn>coduiwes Of I—$riPh 9.11. <br />1)ccWom as Oitpu—: <br />9.11. ENGINEER will be the 'initial interpreter of the <br />requirements of the Contract Do -menu and judge of the <br />acceptability of the Work thereunder: Claims, disputes and <br />other matters relating to the acceptability of the Werk or the <br />interprttuion of the requirements of the Contract Documents <br />pertaining to site performance and furnishing of the Work and <br />Claims redder Articles I and 12 in respect or changes in the <br />Contract Price or Contract Times will be referred initially to <br />ENGINEER in writing with a rectucst for a formal derision in <br />accordance with this para;raph. Wrinen fw'--c of each such <br />claim. dispute or other matter uwi11 be delivered by the claimant <br />to ENGINEER uxltheotherpartytotheAVtcff rttpromfxly <br />tbuc in no cyou tater than thirty daysl aha the trot of the <br />occur once or c VM thigh; rise thereto, sad wr ttm supporting <br />data wnit be submhted to ENGINEER and the other party <br />within sixty days after the stern of Loci; *ec wrcr= or event <br />unkts ENGINEER allows an add hionA period of time for the <br />subosissioet of s"tkxW or tnsx tterrurate d= in of <br />ssuh claim- tf we or other Ria= Zia Opposing patty shall <br />tubrrtit any mqortu to ENGINEER aed the dslmmt within <br />U11Yry days after rt +t of tit C1SIrt9A[�� taSt allblttY l �fttl lCa'3 <br />ENGINE Mk allows asiditkxW thUCL ENGTT4EER will trader <br />a formal dmhon on iu wrong wOm thirty days aft- M0*4 of <br />the oto party's tmbmi=L Jr ray, in jecosrdartec wM this <br />p srapaph, ENGMEER's w00= dociskc an tach chum. <br />ditputc of other trance will be final and btudirs tepee OWNER <br />tad COIR urdcu: [I) an appal from ENGINE -ER's <br />d.,,w,o is taken within the rune Umisa and its aaeadaaoe'with <br />tate set fords is E)CHfBR GC,iI. "`Diaa�ue Rcso- <br />s, ernteard shoo herr ecn GINNER rad C 0N- <br />TRACICIR pursamM to Article I& or nu If no shads Dirixae <br />Resohom A ocroeat has been cohered issm. a wtiucrt 11406m <br />of intension to appeal from ENGINEER'a t wts u= detasion is <br />de6vess4 by OWNER or CON ItAMR to tee Other and to <br />ENGIN EXR wishin. thirry day's after the date of such derision <br />and a (enrol Parafi its by the appot iunt Gey in <br />a forurti of eornp amt Jwtsdiction to csexrtsc such rights or <br />rcvvedmm U the sPpcalinc Icy may have with respact to turh <br />Maim, dispurtc or other. _tatter in accordance wwhh applicable <br />Laws end Regulations wi%kdn sixty days of the date of tsx-h <br />dec4ipn, uruess otherwise aslcexd in wrtung by OWNER and <br />CONTgACMR. <br />9.12. When fwtuionsng as interpreter and judtc under <br />paragraphs 9.10 and 9.11. ENGINEER will sat show partiality <br />to OWNER or COMPVCI'OR and will not be liable in <br />eOnneesion with any intcrtmcW- or derision rendered in <br />good faith in such csparsty. The rettd.t in; of a derision by <br />ENGINEER pursuant to par-agtsphs'9.10 err 9.11 with rcs;aea <br />ro any such claitm dispute or other nwtr (cxaxpt arty wiaich <br />hive batt waived by the Mtking of-rxPuncc of f1ns1 <br />payment as prcvidcd in paragraph t4.1'6) wail be a condition <br />precedent to any exercise by OWNER or CONTRACTOR Of <br />such rights err tcriedies as eiUicr may otherwise have under the <br />Contract Docun=Ls or by Laws or RegtetariOns in mpoct of <br />any surlt claim. dispute or other moues Pursuant to Article 16. <br />9. U. lienor xiaaer ars ENGINEER's Aud-O rued Rcspartrt2"ai <br />9.13.1. Newscr ENGINEER's authority err rIMPO allail- <br />ity under this Article 9 or under any other Pmvisiotl of the <br />COnvact DOeuntcnts norany do -isles mldc by ENGINEER <br />in stood faith tither to ex erase or n K exercise such authority <br />or responsibility or the unduukint. cxerriie err performance <br />of any authority Or responsibility by ENGINEER shall <br />create. tMPOse or give ries to any duty owed by ENGINEER <br />to CONTRACTOR- any Subconuactor, any Supplier. any <br />other person or OrtartiMZ.tion. or to any surety for or cm• <br />ptoyee or agent of any Of than <br />00100-32 <br />
The URL can be used to link to this page
Your browser does not support the video tag.