My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-221
CBCC
>
Official Documents
>
1990's
>
1999
>
1999-221
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/31/2023 3:34:35 PM
Creation date
10/31/2023 3:19:01 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Miscellaneous
Approved Date
08/24/1999
Control Number
1999-221
Entity Name
Treasure Coast Contracting, Inc.
Subject
Sebastian Water Assessment Project, Phase 2C
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
189
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />r will be incorporatexf into a form of Application for Payment <br />ac ceptshlc to ENGINEER. Prnpaes: payments on account of <br />Unit Prise 'Work will be ba -sed an the number of sines com- <br />pleted, <br />s <br />Appkarioa fcr Pmgr= PVmcnr; <br />14.". At lc= twenty days before the date established for <br />etch progress padment (but not more often than once a <br />month). CONT%LACI'[?R shall submit to r-MINEER far <br />review an Application for payment filled out and signed by <br />CONTRACTOR covering the Wort: eomoleted ns of the date <br />of the Application and accompanied by such supporting <br />documentation as is required by the Contract Documents. if <br />payment is requested on the basis of materials and COP- <br />ment rat incorporated in the Work but delivered and suitably <br />stored at the site or ac another loe:zdon agreed to in writing. <br />the Application for payment shall also be accompanied by a <br />bill of silo, invoice or other documentation wutxnting that <br />OWNER has received the rnateials acid equipment free and <br />dear of all liens and evidence that the materials and <br />equipment are covered by appropriate property insurance <br />and otherarra igements to protect OWNER -s interest therein. <br />all or which will be satisfactory to OWNER. The amount of <br />retainage with respect to progress payments will be as <br />stipulated in the Agreement. <br />CONTRACTOR 'S W-ra fuY Of Vdc: <br />14.3. CONT RA=P- warrastts a.rtd ptarantees that Lido to <br />all Work. materials and equipment covered by any Application <br />for payment, whether incorporated in the Project or not, wilt <br />pass to OWNER no latex than the time of payment free and <br />dear of all laces. <br />,Recti®rrfApplfracrrartsfereP-tr=Prk- vl. <br />14.4. ENGINEER will, within ten days after receipt of <br />—,h Armlknfksn frr Pau elft. etither indi=re in writins Z <br />peconunendadon of paYn"t and present the Application to <br />OWNER., or return the Application to CONTRACTOR indi- <br />calng in writing ENGINEER's recons for refusing to rccum- <br />mend payment, In the laser case. CONTMMOR may make <br />the nceesury carroctions and resubmit the Application. Ten <br />days after presentation of the Application for Payment to <br />OWNER with ENGINEER's recomroc-ndation. the unount <br />rcemtttte ,dcd will isubjae to the provisions of the last sen- <br />tesane of paragraph 14,71 beeonw due and when due will be paid <br />by OWNER to CONTRACIC7R. <br />14.5. ENGINEER's recommendation of any payment re- <br />qucsted in an Application for Paymcm will constitute a reprc. <br />sentstion by ENGIN EER to OW NER, based on ENGINEER's <br />ern -site obsemdons of the executed Work as an expcncnccd <br />IM qualified desipt professlorul and on ENGINiwER's revirw <br />of the Application Icer Payment and the accompanying data and <br />selseduha. that to the boss of ENGtNEER's kouuAcd fe. infor- <br />mation and belief: <br />14.5.1. the Work has progressed to the point indicated, <br />14.5.' the quality of the Work is =cncrally in accor- <br />dance with the Contract Doctiments <br />
The URL can be used to link to this page
Your browser does not support the video tag.