My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-222
CBCC
>
Official Documents
>
2020's
>
2023
>
2023-222
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2023 3:49:17 PM
Creation date
11/2/2023 2:51:14 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
10/03/2023
Control Number
2023-222
Agenda Item Number
8.L.
Entity Name
Kimley-Horn and Associates, Inc.
Subject
Work Order 4 Construction Phase Services for Utility Work by Highway Contractor Projects;
Project ID: 41.21.548
Document Relationships
2023-221
(Cover Page)
Path:
\Official Documents\2020's\2023
2023-223
(Cover Page)
Path:
\Official Documents\2020's\2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FXHIRIT UA <br />Oslo Road Widening Utility Improvement Project <br />Project ID 41.21.548 <br />PROJECT UNDERSTANDING <br />Indian River County Department of Utilities Services (IRCDUS) is relocating approximately <br />10,200 linear feet of 16" PVC water main, 3,700 linear feet of 16" PVC sanitary force main and <br />3,700 linear feet of 12" PVC reuse main in conjunction with the Florida Department of <br />Transportation (FDOT) Oslo Road widening project from SW 82nd Avenue to 58th Avenue. <br />IRCDUS has asked that Kimley-Horn and Associates, Inc. (Consultant) provide professional <br />engineering services for post bid plan revisions that have arisen from FDOT comments and to <br />provide construction phase services for the IRCDUS utility relocations. <br />The following scope of services details the professional engineering services for the post bid <br />plan revisions and construction phase services associated with the Oslo Road widening project <br />from SW 82nd Avenue to 58th Avenue. <br />SCOPE OF SERVICES <br />Task 1— Post Bid Plan Revisions <br />The CONSULTANT will make design and plan revisions as necessary to accommodate the FDOT <br />design revisions associated with the full access median opening for MWI Pumps and the <br />revised cross drain located approximately 2,900 linear feet east of 74th Avenue. <br />Task 2 - Construction Phase Services <br />The CONSULTANT will provide professional construction phase assistance as specifically stated <br />below: <br />1. Pre -Bid Meeting. The CONSULTANT will attend the pre-bid meeting to assist the <br />COUNTY in describing the scope of work contained with the construction documents. <br />The CONSULTANT shall provide oral and/or written clarifications to questions <br />presented relative to the scope of work identified within the construction <br />documents. <br />2. Clarifications and Interpretations. The CONSULTANT will respond to reasonable and <br />appropriate Contractor requests for information and issue necessary clarifications <br />
The URL can be used to link to this page
Your browser does not support the video tag.