My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-223
CBCC
>
Official Documents
>
2020's
>
2023
>
2023-223
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2023 3:15:17 PM
Creation date
11/2/2023 2:58:01 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
10/03/2023
Control Number
2023-223
Agenda Item Number
8.L.
Entity Name
Kimley-Horn and Associates, Inc.
Subject
Work Order 5 Construction Phase Services for Utility Work by Highway Contractor Projects;
Project ID: 41.22.516
Document Relationships
2023-221
(Agenda)
Path:
\Official Documents\2020's\2023
2023-222
(Agenda)
Path:
\Official Documents\2020's\2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
and will review and make recommendations related to Change Orders submitted or <br />proposed by the Contractor. <br />4. Shop Drawings and Samples. The CONSULTANT will review and approve or take <br />other appropriate action in respect to Shop Drawings and Samples and other data <br />which Contractor is required to submit, but only for conformance with the <br />information given in the Contract Documents. Such review and approvals or other <br />action will not extend to means, methods, techniques, equipment choice and usage, <br />sequences, schedules, or procedures of construction or to related safety precautions <br />and programs. <br />5. Applications for Payment. All applications for payment will be reviewed and <br />approved by the COUNTY. <br />6. Final Notice of Acceptability of the Work. The County will be responsible for project <br />acceptance, as -built drawing review and permit certifications. <br />7. Limitation of Responsibilities. The CONSULTANT shall not be responsible for the acts <br />or omissions of any Contractor, or of any of their subcontractors, suppliers, or of any <br />other individual or entity performing or furnishing the Work. The CONSULTANT shall <br />not have the authority or responsibility to stop the work of any Contractor. <br />8. Record Drawing Review and Permit Certification. The CONSULTANT will review the <br />Record Drawings as submitted by the Contractor. Based upon receiving acceptable <br />Record Drawings from the Contractor, the CONSULTANT will prepare and submit <br />certifications to the following jurisdictional agencies: <br />• Indian River County <br />• Florida Department of Environmental Protection <br />• Sebastian River Improvement District <br />9. Final Notice of Acceptability of the Work. The CONSULTANT will, promptly after notice <br />from Contractor that it considers the entire Work ready for its intended use, in <br />company with the COUNTY and Contractor, conduct a site visit to determine if the <br />Work is substantially complete. Work will be considered substantially complete <br />following satisfactory completion of all items with the exception of those identified on <br />a final punch list. The CONSULTANT will conduct a final site visit to determine if the <br />completed Work of Contractor is generally in accordance with the Contract <br />Documents and the final punch list so that the PROFESSIONAL may recommend, in <br />
The URL can be used to link to this page
Your browser does not support the video tag.