Laserfiche WebLink
Exhibit 1 - Standard Rates <br />G. K. ENVIRONMENTAL, INC. <br />,-.. Environmental Consulting <br />GEORGE R. KULCZYCKI, CEC, CES, CEI <br />155 McKee Lane <br />Vero Beach, FL 32960 <br />Phone 772-567-9129 <br />Email gke(i)me.com <br />G. K. Environmental, Inc. Fee Schedule & GKE Subcontractor Fee Schedule <br />10/1/2023-9/30/2025 <br />G. K. Environmental, Inc. Fee Schedule <br />President, Principal Ecologist.......................................................... <br />Administrative Assistance................................................................. <br />GKE boat / fuel / associated sampling water sampling, depth, &..... <br />video equipment <br />Phase I Audits / Environmental Site Assessments ...................... <br />(includes historic aerial site reviews / onsite inspections, <br />and evaluations of. hazardous waste, preliminary endangered & <br />threatened species, and approximate wetland locations) <br />PhaseII and III.............................................................. <br />GKE reimbursement expenses ............................................. <br />Travel........................................................................ <br />$175.00 / hour (or lump sum) <br />$ 60.00 / hour (or lump sum) <br />$115.00 / hour (or lump sum) <br />GKE Standard Fee: <br />$3,795.00 (<3.0 acre site) <br />20% per proposal <br />photo b/w copies $0.15; <br />photo color copies $0.50; <br />postage: per postage invoice <br />no mileage cost in IRCo; <br />$0.50 / mile outside IRCo <br />G. K. Environmental, Inc. Subcontractor Coordination and Supervision Services Fee Schedule <br />Certified Gopher Tortoise Surveys ....................................... $175.00 / hour or 20% per <br />proposal <br />Landscape & Maintenance Service ......................................... 20% per proposal <br />Archaeological Service ...................................................... 20% per proposal <br />CAD Operator..................................................................................... $120.00 per hour <br />Field Assistant I................................................................................. $ 75.00 per hour <br />Field Assistant II Biologist / Chemist ..................................... $120.00 per hour <br />6gq!V Z R. xyks yckv July 27, 2023 <br />George R. Kulczycki, President, Principal Ecologist Date <br />