My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-231
CBCC
>
Official Documents
>
2020's
>
2023
>
2023-231
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/9/2023 10:25:23 AM
Creation date
11/9/2023 10:24:35 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Amendment
Approved Date
10/17/2023
Control Number
2023-231
Agenda Item Number
8.H.
Entity Name
Bowman Consulting Group, LTD
Subject
Amendment 1 to Work Order 14 for North County24-Inch Force Main Replacement
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Work Order 14 Amendment 1 <br />EXHIBIT A — SCOPE OF WORK <br />PID 21.23.503 <br />Bowman Consulting Group (Bowman) will provide professional services to Indian River County Dept of Utility <br />Services (Utilities) to replace a segment of 24" ductile iron forcemain between the North County Wastewater <br />Treatment Facility (NCWWTF) site and Old Dixie Highway. During a recent repair the subject main was found to <br />be significantly corroded. Excavation and visual inspection of other locations along that segment of main revealed <br />similar distress. The likelihood that the pipe will fail again is high. <br />Utilities has therefore requested that Bowman prepare an engineering design to replace this high-value asset. <br />Bowman proposes to provide the following services: <br />Task 8 — Additional Survey along the Revised Forcemain Alignment <br />Bowman will provide additional topographic data along the revised forcemain alignment, generally the area south <br />of the original alignment. The field data will be merged with the data of the prior survey. <br />1. Boundary lines will be plotted from the best available evidence. A Boundary Survey is not a <br />part of this scope. <br />2. All above ground visible utilities and drainage features will be located along with the associated <br />invert elevations determined. <br />3. An appropriate number of elevations will be collected to generate contours at a 1 -foot interval. <br />4. Gopher tortoise burrows will be located as marked by others. <br />Deliverables <br />Certified PDF and Paper Copies of the Revised Survey <br />Task 9 — Sketch and Legal Description of Proposed Utility Easement <br />Bowman will provide a sketch and legal description of the proposed 20 -foot -wide utility easement. <br />Deliverables <br />Certified PDF and Paper Copies of the Sketch and Legal Description <br />Task 10 — Additional Tortoise Survey & Relocation Permitting <br />Bowman will provide a gopher tortoise survey of 100% of on-site suitable tortoise habitat along the revised <br />alignment. The survey will determine the number and location of the tortoises in the work area. <br />*Note: the professional fee for this task does not include the FWC application fee, which is based on the resident <br />tortoise population. As set forth in Work Order 14, Task 2, Bowman will discuss fees for relocation following the <br />tortoise survey if necessary. <br />
The URL can be used to link to this page
Your browser does not support the video tag.