My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-177 A
CBCC
>
Official Documents
>
1990's
>
1999
>
1999-177 A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/13/2023 1:44:09 PM
Creation date
11/13/2023 1:42:22 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/06/1999
Control Number
1999-177A
Entity Name
Summit Construction Management, Inc.
Subject
Dale Wimbrow Park Improvements
Project Number
9625B
Bid Number
9061
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
106
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
w <br />Board of County Commissioners <br />f 1840 25th Street <br />i Vero Beach, Florida 32960 <br />Telephone: (561) 567-8000 <br />f <br />l June 4, 1999 <br />IMPROVEMENTS TO <br />DALE WIMBROW PARK <br />IRC PROJECT NO. 96258 <br />IRC BID NO. 9061 <br />BID OPENING DATED: <br />WEDNESDAY, JUNE 16, 1999 <br />ADDENDUM NO_. 1 <br />f <br />TO ALL PROSPECTIVE BIDDERS: <br />The following clarifications, amendments, additions, deletions, and revisions form a pan of the <br />Contract Documents and change the original documents only in the manner and to the extent stated: <br />This Addendum shall be attached to and become a part of the Contract Documents. <br />I. Please find enclosed revised Bid Proposal Sheets BP -3 and BP -4. The following changes have <br />been made to these sheets: <br />A. Sheet BP -3, Item No. 2 - Performance Bond and Payment Bond: This item is a <br />combination of two previous items. <br />B. Sheet BP -3, Item No. 9 - Clearing and Grubbing (including removal of trees, flumes, <br />concrete pads, wood posts, etc.): Wood posts were added to the item description and <br />are intended to be the existing wood posts located in the playground area. <br />C. Sheet BP) -3, Item No. 10 - Cap existing well (2"): The size of the well has been added. <br />This well is currently capped with a PVC cap and has been cut off at concrete level. <br />Permanent cap to meet County regulations is required. Concrete pad is to be removed <br />and paid for under Clearing and Grubbing. <br />I D. Sheet BP -4, Item No. 34 - Light Pole, Complete (ready for use) was added. This item <br />t , includes electrical connection and complies with specifications and drawings that are a <br />part of the Original Contract Documents. <br />1 . The Contract Documents and Construction Plans should then consist of the original documents, plans <br />and: <br />1-. 1. Addendum No. 1, dated June 4, 1999. <br />L <br />C,CmrC icc7Capital Projecu\9625B Addendum l.wpd <br />L
The URL can be used to link to this page
Your browser does not support the video tag.