My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-177 A
CBCC
>
Official Documents
>
1990's
>
1999
>
1999-177 A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/13/2023 1:44:09 PM
Creation date
11/13/2023 1:42:22 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/06/1999
Control Number
1999-177A
Entity Name
Summit Construction Management, Inc.
Subject
Dale Wimbrow Park Improvements
Project Number
9625B
Bid Number
9061
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
106
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
May 25, 1999 <br />5. GENERAL CONSTRUC'T'ION REOUIREMENTS: <br />A. Materials Handling_ 'Che Contractor shall make arrangements at this own expense for the <br />unloading and storing of materials at an approved location until needed for installation. <br />Under no circumstances will pipe, materia;s, or structures placed on the job site obstruct <br />driveways or streets or be placed within three feet of the pavement of streets or highways. <br />The Contractor shall provide and maintain approved barricades, warning lights, and guards <br />necessary for the protection of the public. The Contractor shall coordinate said barricades, <br />lights, and guards with the County. <br />B. Cofinemgnl of Operations• All construction operations by the Contractor shall be confined <br />to public rights-of-way, easements, or building sites secured by the County for this work. No <br />equipments moving, parking, material storage, etc., shall be permitted on private property <br />without the property owner's consent in writing. <br />The Contractor shall be re¢ponsible for trespassing upon private property and for damage to <br />any property, public or private. <br />Easements and rights-of-way are shown in approximate location on the Drawings and have <br />been obtained by the County. The Contractor shall be fully responsible for constructing the <br />work within the legal rights-of-way and easements. <br />6. PERMITS AND LICENSES <br />Right -of -Way Permits required for construction within the public right-of-way will be issued by the <br />Public Works Department, Indian River County, at no cost to the Contractor. Any permits for <br />disposal of materials shall be the Contractor's responsibility. See Section 7 of the Special Provisions. <br />7. DISPOSITION OF' DEBRIS <br />All debris shall be removed and disposed of by the Contractor and approved by the Engineer. It is <br />the Contractor's responsibility to obtain all necessary permits. <br />8. LAYOUT OF WORK AND AS -BUILT DRAWINGS: The contractor will provide survey work to <br />establish right-of-way, base lines, centerlines, and grades as may be required for the work prior to any <br />construction. The Contractor shall protect these controls. The Contractor shall keep records on <br />project modifications with sufficient detail so that as -built drawings may be prepared to the Engineer's <br />satisfaction at the Contractor's cost. Contractor shall be responsible for establishing all finished <br />grades with the benchmark datum provided on the plans. <br />SP -2
The URL can be used to link to this page
Your browser does not support the video tag.