Laserfiche WebLink
May 25, !Sqq <br />DDI <br />The work specified in this item shall conform to Section 575 of the Florida Department of Transportation <br />Standard Specifications for Road and Bridge Construction. <br />Bahia sod w-11 be used for all disturbed areas. Fertilizer and water will be included in this work. <br />Item of Payment <br />Payment for the work specified in this item shall be made under: <br />Sodding Square Yard <br />SIGNING AND PAVEMENT MARKING <br />Signing and pavement marking for traffic control shall conform to the requirements of the Standard <br />Specifications (1991 and 1994 Supplement), Manual on Uniform Traffic Control Devices, <br />Supplemental Specifications, Roadway and Traffic Design Standards, manufacturers specifications. <br />2. Traffic Signs: All existing signs which are the property of the Owner shall be transported to the Indian <br />River County Road and Bridge Maintenance Yard by the Contractor during construction if they are <br />within the construction limits. Care shall be exercised by the Contractor.during removal, storage and <br />relocation so as not to damage the signs. If any damage occurs, as determined by the Owner's <br />ENGINEER or Resident Construction Inspector, the sign shall be replaced by the Contractor with <br />no compensation. <br />3. All reflective pavement markers shall be 4" x 4", Stimsonite. <br />SP -12