My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-177 A
CBCC
>
Official Documents
>
1990's
>
1999
>
1999-177 A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/13/2023 1:44:09 PM
Creation date
11/13/2023 1:42:22 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/06/1999
Control Number
1999-177A
Entity Name
Summit Construction Management, Inc.
Subject
Dale Wimbrow Park Improvements
Project Number
9625B
Bid Number
9061
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
106
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br />i <br />Mechanical, electrical and electronic systems (not <br />limited to work of Divisions 15 and 16). <br />S Live plant materials, lawns and irrigation systems <br />well, pump, and potable water treatment systems. <br />PART 3 - EXECUTION <br />3.01 FINAL CLEANING: <br />At closeout time, clean or reclean entire work tonormallevelfor "first class" maintenance/cleaningofbuildingprojectsofasimilarnature. Remove <br />non -permanent protection and labels, polish glass, <br />clean exposed finishes, touch-up minor finishdamage, clean or replace filters of mechanical <br />i systems, remove debris and broom -clean non -occupiedspaces, sanitize plumbing facilities, clean lightfixturesandreplaceburned-out/dimmed lamps, sweepandwashpavedareas, police yards and grounds tothepropertyline, and perform similar lean.._ <br />v icanuNoperationsneededtoproducea "clean" condition asdeterminedbyArchitectandOwner's Representative. <br />1 3.02 PROCEDURES AT SUBSTANTIAL COMPLETION: <br />A. Prerequisites: Comply with General Conditions and <br />complete the following before requesting the Archi- tect's and the County Engineer's inspection of the <br />work, or designated portion thereof, for substantial4completion: <br />t <br />Complete installation of building and equipment tosuchlevelastheownercould, if necessary, occupythefacilities. <br />Submit executed warranties, workmanship bonds, <br />maintenance agreements, inspection certificates and <br />similar required documentation for specific units ofwork, enabling Owner's unrestricted occupancy and <br />use. <br />Complete instruction of Owner's operating personnel, <br />and start-up of systems. <br />Complete final cleaning, and remove temporaryfacilitiesandtools. <br />B. Inspection Procedures: Upon completion of Con- tractor's own punch list items and receipt ofContractor's request for inspection the Architect <br />and County Engineer will either proceed with inspec- tion or advise Contractor of prerequisites not ful- filled. Following initial inspection, The Architect <br />01700-2
The URL can be used to link to this page
Your browser does not support the video tag.