My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-177 A
CBCC
>
Official Documents
>
1990's
>
1999
>
1999-177 A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/13/2023 1:44:09 PM
Creation date
11/13/2023 1:42:22 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/06/1999
Control Number
1999-177A
Entity Name
Summit Construction Management, Inc.
Subject
Dale Wimbrow Park Improvements
Project Number
9625B
Bid Number
9061
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
106
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
E: <br />SECTION 02301 <br />SUBGRADE <br />1. DESCRIPTION <br />A. The subgrade will be constructed such that after being compacted it will <br />conform to the line, grade, and cross sections as shown on the Drawings. <br />Shoulders shall be stabilized and compacted as specified herein for subgrades. <br />2. FLORIDA BEARING VALUES <br />A. The subgrade shall have a minimum bearing value of 75 pounds per square <br />inch (psi) as determined by the Florida Bearing Value Test. In an area where <br />the bearing value is less than 75 psi, stabilizing material approved by the <br />Engineer shall be furnished by the Contractor, spread and mixed in accord- <br />ance with Section 160-5.3 "Mixing"of the 1986 Edition of the Florida D.Q.T. <br />Specifications. <br />3. CONSTRUCTION DETAILS <br />A. The subgrade shall be shaped, graded, and rolled to conform to the lines and <br />grades as shown on the Drawings. Fine grading of the subgrade to its final <br />profile shall be accomplished after the existing ground has been excavated as <br />close as possible to the design elevations. In fill areas, fine grading of the <br />subgrade shall be accomplished after fill is spread and compacted in accord- <br />ance with Section 203 of these Specifications - "Backfill and Compaction". <br />B. All drainage culverts and utility conduits which will be installed under the <br />pavement shall be installed prior to the final shaping and compaction of the <br />subgrade. <br />4. COMPACTION <br />A. The top of the subgrade in both cuts and fills shall be compacted to a <br />minimum of 98 percent of the maximum dry density to the depth specified on <br />the Plans. The required density shall be maintained until the base course has <br />been constructed. The subgrade shall be compacted with an approved self- <br />propelled steel drum or pneumatic tired roller weighing not less than 8 tons. <br />All hollows and depressions which develop under rolling shall be filled in with <br />suitable material. The process of grading and rolling shall be repeated until no <br />depressions develop. After compaction, the top surface of the fine grade shall <br />be true to line and grade at all locations. If the fine grade becomes rutted or <br />displaced due to any cause whatsoever, the Contractor shall regrade it and <br />recompact it. Ditches, drains, and swates shall be maintained along the <br />completed subgrade section after their construction. <br />B. In no case shall the Contractor proceed to construct the base course on the <br />subgrade until the subgrade has been tested for Florida Bearing Values and <br />compaction, line and grade is checked, and approval given by the Engineer. <br />5. STABILIZED SHOULDERS <br />A. Stabilized shoulders shall be constructed on cacti side of the paved roadway <br />02301 1
The URL can be used to link to this page
Your browser does not support the video tag.