Laserfiche WebLink
40 <br />AGREEMENT <br />V BETWEEN EcORDS or <br />INDIAN RIVER COUNTY, FLORIDA aE�t:y K eARTCN <br />And MENK GN CW OOURY <br />L HARBOR STORAGE, LTD. NDM RWR CO., FIA. -- <br />t!1 <br />C ROerence: Expedited Temporary Water Service and Participation in Future Special Assessment <br />Program N <br />C THIS AGREEMENT, made this 21st Day of S e p t e qi U @ r 9 9, by and between INDIAN RIVER <br />COUNTY, a political subdivision of the State of Florida hereinafter known as the "COUNTY", and HARBOR <br />STORAGE, LTD, located at 5697 US Highway # 1, Vero Beach, Florida, hereinafter known as the "OWNER". <br />WITNESSETII: to I <br />kaI <br />WHEREAS the OWNERS desire to have temporary water service made available to the property located.. <br />rn <br />-o <br />in Indian River County, Florida (See "EXHIBIT A"), from a new connection to an extension of an already existing watetty <br />line, (the "Temporary Expedited Line"), before the COUNTY is ready to construct a new water line, (the "Specia -" <br />Assessment" line). Said new line to be paid for by special assessment of the OWNER'S property, as well as other <br />v4 <br />properties in the Special Assessment Project, and <br />WHEREAS the COUNTY requires the OWNERS, at the time of the installation of the Temporary <br />Expedited Connection, to pay certain fees immediately, and to participate in certain costs of the Special Assessment Line <br />when the COUNTY undertakes the Special Assessment Project. <br />NOW THEREFORE, for and in consideration of mutual covenants contained herein, the receipt of which <br />is acknowledged, COUNTY and OWNERS a. -Cc as follows: <br />1. Upon signing this Agreement, the OWNERs shall pay the following amount, <br />per Equivalent Residential Unit, (ERU's): <br />(6 ERU's) - Capacity Charges .....................$ 7,800.00 <br />Inspection Fee ........................ 25.00 <br />Security Deposit ...................... 300.00 <br />Recording Fee ......................... 24.00 <br />Meter Fee .............................. 130.00 <br />TOTAL ............................... .$ 8,279.00 <br />The OWNER agrees to extend water service from the EAST side US I, to the site located along the WEST <br />Side of US I. The OWNER agrees to bear any costs associated with construction , and shall be responsible for all <br />Permitting associated with construction. <br />r 5 The COUNTY shall connect the OWNER'S property to a Temporary Expedited Connection point of <br />u <br />theCOUNTY'S choosing. When service is available from the Special Assessment Line, the OWNERS may be required to <br />disconnect fiom the Temporary Expedited Connection, and reconnect to the Special Assessment Line. Any such U0 <br />reconnection would be at the expense of the OWNERS, with the exception that the OWNERS would not be required to -0 <br />O <br />pay the Capacity Charge, Security Deposit, or Meter Fee, again. M <br />tV <br />2. Whether the OWNER is required to reconnect to the Special Assessment Line, or remain — <br />connected to the Temporary Expedited Connection, the OWNERS shall participate in the cost of the Special Assessment <br />CArny docs\Dan Marbor storage Agreement <br />