My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-245
CBCC
>
Official Documents
>
1990's
>
1999
>
1999-245
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/16/2023 3:30:34 PM
Creation date
11/16/2023 3:22:31 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
09/21/1999
Control Number
1999-245
Entity Name
Sheltra & Son Construction
Subject
Contract and Bid Award for Shooting Range Site Work
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
166
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 103 - AS43UILT PLANS <br />143-1 Description <br />The contractor shall maintain one (1) record copy of all contract documents as stipulated <br />In paragraph 6.22 of the GENERAL CONDITIONS. The contractor shall have marked on <br />the drawings, all deviations from the original drawings and specifications. The contractor <br />shall verify the as -built elevations of all drainage structure pipe inverts, ditch block tops, <br />roadway centerline, pavement edges, berm heights, stormwater management tracts <br />profiles, and building pad elevations. The contractor shall mark these elevations upon the <br />one (1) set of record drawings. The marked revisions and verifications shall be neat and <br />legible. <br />103-2 Basis of Payment <br />Work and incidental costs specified as being covered under this Section will be paid for <br />at the contract unit price satisfactorily completed and accepted, in accordance with the <br />provisions of the GENERAL CONDITIONS. <br />Payment shall be made under <br />Item 103 As-Builts - Lump Sum <br />SECTION 104 - PREVENTION, CONTROL, AND ABATEMENT OF EROSION AND WATER <br />POLLUTION <br />104-1 Description <br />Prevention, control, and abatement of erosion and water pollution shall conform to the <br />requirements of Section 104 of the F.D.O.T.S.S.. <br />104-11 Basis of Payment <br />Work and incidental costs specified as being covered under this Section will be paid for <br />based on the percentage of the contract amount completed. <br />Payment shall be made under: <br />Item No, 104 - Prevention, Control and Abatement of Erosion and Water Pollution - Lump <br />Sum <br />SECTION 120 - EXCAVATION AND EMBANKMENT <br />120-1 Description <br />The work specified in this section shall conform '�u Section 120 of the F.D.O.T.S.S.. <br />Excavation and embankment shall include labor, equipment, transportation and grading. <br />All materiae is proposed to come from on site, from the cutting of swales and the <br />excavation of the fish pond. <br />TECHNICAL SPECIFICATIONS k. <br />
The URL can be used to link to this page
Your browser does not support the video tag.