Laserfiche WebLink
4P <br />28. Within 30 days of parmit i5SU nCe the permittee roust <br />submit to the District a plan for monitoring passible lead <br />movement outside of the shotgun range fallout zone. The <br />plan must include baseline and quarterly sampling at two <br />points directly to the east and nest of the fallout zone. <br />The plan must be approved in writing by the District and <br />baseline monitoring must occur before the range is opened to <br />f public use. The permittee must provide the results of each <br />monitoring event to the District within 30 days of <br />Lanni for ing . <br />7.9. Should monitoring reveal evidence of lead transport <br />outside of the fallout zone, the permittee must apply for a <br />permit modification with So days that would include <br />additional measures to prevent lead transport, including but <br />not limited to the placement of an impervious barrier in the <br />soil at the edges of the fallout zone. <br />