My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-245
CBCC
>
Official Documents
>
1990's
>
1999
>
1999-245
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/16/2023 3:30:34 PM
Creation date
11/16/2023 3:22:31 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
09/21/1999
Control Number
1999-245
Entity Name
Sheltra & Son Construction
Subject
Contract and Bid Award for Shooting Range Site Work
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
166
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
s <br />Permittee: IMIAN RIVER COUNTY <br />Permit No: 19904088(IP-Is) <br />2. The applicant agrees to submit a mitigation monitoring plan, <br />within 30 days of issuance of this permit, for the wetlands <br />enhanced/restored by the repair of the dike. The pian should <br />include baseline information such as existing water elevations and <br />plant communities. The pian will require written approval by the <br />Corps and shall be initiated concurrently with the construction <br />authorized by this permit. <br />3. The permittee agrees that all monitoring reports generated by <br />the mitigation plan will be mailed to the Merritt Island <br />Regulatory Field Office at 2460 North Courtenay Parkway, Suite <br />101, Merritt Island, Florida 32953. Each monitoring report must <br />include the following items: <br />(1) the Department of the Army Permit number, <br />(2) the sequence number of the report being submitted, <br />(3) the date the next report is expected to be submitted, and <br />(4) a brief summary of the status of the mitigation including <br />any problems encountered and the remedial actions taken. <br />4. As preventative measures for lead contamination at the project <br />site, the permittee agrees to abide by the sJRWMD permit <br />##4 -061 -0174G -£RP special conditions numbers 26 through 29 <br />(Attachment #2). <br />5. The applicant has agreed to develop an Eastern indigo snake <br />protection/education plan for the review and approval of the Fish <br />and Wildlife service at least thirty (30) days prior to the <br />commencement of construction or clearing activities. The plan <br />phni„Q-A Y -,e c*.tbmittz-A -%. the CiLLm,1Llun UT Wes Shockley, FWS, P.O. <br />Box 2676, Vero Beach, Florida 32961-2676. A copy of all <br />correspondence should be sent to the Merritt Island Regulatory <br />Field Office (address as stated above). <br />Further Information, <br />1. Congressional Authorities: You have been authorized to <br />undertake the activity described above pursuant to: <br />( ] Section 10 of the Rivers and Harbors Act of 1999 <br />(33 U.S.C. 403). <br />
The URL can be used to link to this page
Your browser does not support the video tag.