Laserfiche WebLink
i <br />830-1-13(2) <br />Conduil (Under pavement, Y, SCM 40 PVC)i <br />107 <br />LF <br />$ S " <br />$30-1-13(4) <br />Conduit (Under pavement, 4', SCM 40 PVC) <br />270 <br />LF <br />S $ to o?i-M <br />TOTAL BASE 810 <br />ALTERNATE NO. 1 <br />430-982- <br />Mitered End Section (18') <br />2 <br />EA <br />$ 210 zz <br />$ 21ev,fd <br />325 <br />pavement Messages. Thermoplastic (4' <br />White), MIC Symbol <br />10 <br />EA <br />S i s.ma <br />i1`i�a�.kiop <br />430-982- <br />Mitered End Section (19" x 30') <br />8 <br />EA <br />$ 595.m�y <br />S 35�A6 00 <br />403 <br />Solid Tralfic Stripe, Thermoplastic (8' Blue) <br />204 <br />1 LF <br />S <br />430-982- <br />Mitered End Section (24" x 38'} <br />7. <br />EA <br />S Pi�.PO <br />S <br />4qd <br />430-984- <br />7-1 <br />Mitered End Section (38) <br />1 <br />EAElft:1 <br />238 <br />TOTAL ALTERNATE NO. 7 <br />ALTERNATE NO. 2 <br />i�� eM'z0 <br />70040-1 <br />Sign, Single Post, MIC (FTP -26) <br />10 <br />A5 <br />$ 210 zz <br />$ 21ev,fd <br />711-3 <br />pavement Messages. Thermoplastic (4' <br />White), MIC Symbol <br />10 <br />EA <br />S i s.ma <br />i1`i�a�.kiop <br />711.35=81 <br />Solid Traffic Stripe, Thermoplastic (8' <br />Whitey <br />1,380 <br />LF <br />S +{� �j <br />55—FiZ&,00 <br />711.39.81 <br />Solid Tralfic Stripe, Thermoplastic (8' Blue) <br />204 <br />1 LF <br />S <br />TOTAL ALTERNATE NO. 2 <br />GRAND TOTAL COMBINED BIO <br />PKI I I EM EQQI COTES <br />104 This shall include, but not be limited to, baled hay, turbtlily barriers, staked sill kmw. and <br />any additional items necessary to meet the erosion control requirements of the Florida <br />Department of Transportation as prescribed in Section 104 of the FDOT Standard index. <br />120-1, 2-1,6 All grading including final grading to be included in cost of excavation or embankment. <br />1201, 2.1, 8 Paid based on plan quantity. <br />1805 Paid based on plan quantity. <br />430-11-323 Include the cost of the concrete collar. <br />430-34-345 Include the cost of the steel plates. <br />545.70 Include cost of backfill. compaction, pias, and any addltional items necessary to comply with <br />Manufacturer's requirements for a complete system. <br />5701 Include the cost of seed and fetfflixer. <br />573-1 Include the cost of seed, Fertilizer, and fiber mulch - <br />575 -1-1 Include the cost of fediiizer. <br />OP -4 <br />