My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-245
CBCC
>
Official Documents
>
1990's
>
1999
>
1999-245
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/16/2023 3:30:34 PM
Creation date
11/16/2023 3:22:31 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
09/21/1999
Control Number
1999-245
Entity Name
Sheltra & Son Construction
Subject
Contract and Bid Award for Shooting Range Site Work
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
166
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
41111111111 <br />0 <br />The determination of the appropriate method(s) of complianre is the complete and sole <br />responsibility of the BIDDER Such methods will not be checked by the OWNER or <br />ENGINEER for accuracy, completeness or any other purpose. Tire OWNER and ENGINEER <br />shall have no responsibility to review or check the BIDDER'S compliance with the Trench <br />Safety Standards. <br />7. The BIDDER has allocated and included in its bid the total amount of $ based on <br />}� the square feet of shoring to be used for compliance with shoring safety requirements and <br />■ intends to comply with said shoring requirements by instituting the following specific <br />method(s) of compliance on this Project. <br />The determination of the appropriate method(s) of compliance is the complete and sole <br />responsibility of the Excavation Contractor. Such methods will not be checked by the <br />OWNER or ENGINEER for accuracy, completeness or any olhef purpose. The OWNER and <br />y ENGINEER shall have not responsibility to review or check the BIDDER'S compliance with <br />ll the Trench Safety Standards. <br />S. The BIDDER, in submi4ling this bid, represents that it has obtained and considered all <br />available geolechnical information, hasutilized said geotechnical irtforrnation and that, based <br />on such information and the BIDDER'S own information, the BIDDER has sufficient <br />!knowledge of the Project's surface and subsurface site conditions and characteristics to <br />assure BIDDER'S compliance with the applicable Trench Safety Standards in designing the <br />trench safety system(s) for the Project. + / <br />Q <br />I81ER <br />By <br />iy (--Cf, 1(at`TRCM)coi�l4- Licet)se, 4tgt) <br />tP or rn.f <br />1 y � ice) <br />SWORN TO AND SUBSCRIBED before me Ihis � day of ,-�tt999. <br />my onimis-sion ire '� , i" C •a �r. <br />NotAry Put�l c _ ... <br />=+; •;tea <br />rr,L51?rTi e:L <br />e if <br />��r171 r f I N ri11�1 <br />TRENCH STATEMENT <br />r -a <br />
The URL can be used to link to this page
Your browser does not support the video tag.