My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-245
CBCC
>
Official Documents
>
1990's
>
1999
>
1999-245
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/16/2023 3:30:34 PM
Creation date
11/16/2023 3:22:31 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
09/21/1999
Control Number
1999-245
Entity Name
Sheltra & Son Construction
Subject
Contract and Bid Award for Shooting Range Site Work
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
166
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
do <br />2. Where there are telephone, telegraph, light, or power poles, water main, conduits, <br />pipe, or drains; or other construction either public or private; in or on the streets or <br />allays; the worst shall be so conducted that no interruption or delay will be caused <br />In t`la opeiaiioti or use of the same. Proper written notice shall be givers and all the <br />facilities afforded the owners of such construction encountered or likely to be <br />encni,ntered, as will enable thorn to pro -serve use some from injury. <br />3. The CONTRACTOR will not be permitted to interfere with public travel and <br />convenience by grading or tearing up streets indiscriminately, but the work of <br />conducting the various items of this Contract shall proceed in an orderly, <br />systematic and progressive manner. <br />llc= ll<l is '_ i=1 <br />1. Worm; under this contract will be paid on a lump sum or unit price basis as outlined <br />on the Bid Form for the quantity of work installed. <br />2. Any pay items for which a specific item is not included shall be included in the price <br />of the pay item to which it pertains or is associated. <br />3. Any items not shown or omitted that are required for a complete installation shall <br />be fumished and installed by the CONTRACTOR at no additional cost to the <br />OWNER. <br />4, The prices shall include all labor, materials, tools, equipment required to complete <br />the work. <br />5. No additional payment will be made for wall pointing or other methods of <br />dewatering excavations. <br />5. Payment for repair and replacement of existing utilities will be included in the unit <br />price or lump sum bid amount for the related new construction bid item. <br />Engineering and layout work shalt comply with Section 5-7 of the Florida D.O.T. <br />Standard Specificat+ons for Road and Bridge Constriction (1986), <br />2. The CONTRACTOR will fumish all construction staking for the project. All staking <br />from control will be under the supervision of a flnririn Regni•s-t,ered ewiaV Surveyor- <br />3. <br />urYGyV_.3. <br />The cost of performing enginoering and layout work described alcove shall be <br />included in the contract unit ,prices for the various items of work to which it is <br />incidental. No separate payment will be made for surveying or engineering. <br />SUPPLEMENTARY CON1DITTONS <br />Se - 4 <br />f— <br />
The URL can be used to link to this page
Your browser does not support the video tag.