My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10/31/2023
CBCC
>
Meetings
>
2020's
>
2023
>
10/31/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/20/2023 10:24:47 AM
Creation date
11/30/2023 1:54:10 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
10/31/2023
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
370
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
32 <br />Allowable training -related costs includes Salaries <br />and Fringe Benefits, Develop, Deliver Training, <br />Workshops and Conferences, <br />Certification/Recertification of Instructors, supplies, <br />and Overtime and Backfill . <br />Travel to Emergency Mgmt related Training/Classes/Conferences <br />1 <br />$16,000 <br />$16,000 <br />Total Training Expenditures <br />$ 16,000 <br />Eligible EMPG Equipment Categories: Include only those selected items listed under Section II. C of <br />this grant agreement. <br />Allowable Equipment Costs (Purchasing <br />equipment from either of the two categories below). <br />The two allowable prevention and protection <br />categories and equipment standards for the EMPG <br />are listed at the following website <br />http://www.fema.gov/authorized-equipment-list. <br />Quantity <br />Unit Cost <br />Total Cost <br />Pro ect <br />1 <br />Physical Security Enhancement Equipment (14 - <br />Inspection and Screening Systems (15 -XX) <br />Notification and Warning Systems <br />Radios and Public Address Systems <br />Encryption Software and Remote <br />Authentication <br />Generators <br />Installations and Service Contracts <br />Total Equipment Expenditures <br />$ 0.00 <br />Management and Administration (shall not <br />exceed 5% of the total award amount) <br />Quantity <br />Unit Cost <br />Total Cost Project <br />95 <br />
The URL can be used to link to this page
Your browser does not support the video tag.