Laserfiche WebLink
SECTION 00520 Agreement <br />THIS AGREEMENT is by and between INDIAN RIVER COUNTY, a Political Subdivision of the <br />State of Florida organized and existing under the Laws of the State of Florida, (hereinafter called <br />OWNER) and Close Construction Services, LLC (hereinafter called CONTRACTOR). <br />OWNER and CONTRACTOR, in consideration of the mutual covenants hereinafter set forth, agree <br />as follows: <br />ARTICLE 1 - WORK <br />1.01 CONTRACTOR shall complete all Work as specified or indicated in the Contract <br />Documents. The Work is generally described as follows: <br />The proposed project consists of installation of a lift station and force main, construction of a new <br />restroom building, decommissioning of existing septic system, and demolition and removal of <br />existing restroom, as described and shown on the bid documents, construction drawings and <br />specifications. <br />ARTICLE 2 - THE PROJECT <br />2.01 The Project for which the Work under the Contract Documents may be the whole or only a <br />part is generally described as follows: <br />Project Name: Kiwanis Hobart Park Restroom and Sewer Connection <br />Bid Number: 2023047 <br />Project Address: 5555 77th Street, Vero Beach, FL 32967 <br />ARTICLE 3 - ENGINEER <br />3.01 Kimley-Horn and Associates, Inc. is hereinafter called the ENGINEER and will act as <br />OWNER's representative, assume all duties and responsibilities, and have the rights and <br />authority assigned to ENGINEER in the Contract Documents in connection with the <br />completion of the Work in accordance with the Contract Documents. <br />ARTICLE 4 - CONTRACT TIMES <br />4.01 Time of the Essence <br />A. All time limits for Milestones, if any, Substantial Completion, and completion and readiness <br />for final payment as stated in the Contract Documents are of the essence of the Contract. <br />4.02 Days to Achieve Substantial Completion, Final Completion and Final Payment <br />A. The Work will be substantially completed on or before the 180th calendar day after the date <br />when the Contract Times commence to run as provided in paragraph 2.03 of the General <br />Conditions, and completed and ready for final payment in accordance with paragraph 14.07 <br />of the General Conditions on or before the 210th calendar day after the date when the <br />Contract Times commence to run. <br />